Business EV charging in the East of England: demand and site decisions
The East of England had 9,880 public chargers in the July snapshot [S1]. That regional total cannot tell you whether your car park will attract paying drivers. Compare nearby charging, your visitors' parking time and your electricity supply before choosing fully funded, part funded or self funded installation. Checked October 2026.
Where are public EV charging locations in the East of England?
Start with the council figures below, then investigate the sites your customers would actually use. Public provision is a starting point for a survey, rather than a prediction of charging income. A charger outside your opening hours, or beyond a practical walking route, may serve a different need from your car park.
Summing the council dataset gives these totals. Chargers are dated 1 July 2026 [S1]. Vehicle counts are for 2026 Q2, not the same reporting period [S2].
| Measure | East of England | UK |
|---|---|---|
| Public chargers | 9,880 | 121,171 |
| Rapid or above | 3,210 | 28,887 |
| Public chargers per 100,000 people | 150.2 | 174.9 |
| Rapid or above per 100,000 people | 48.8 | 41.7 |
| Licensed plug-in vehicles | 329,587 | 3,163,742 |
| Battery electric vehicles | 210,830 | 2,127,093 |
For the population comparison, we estimate each council’s population as charger count ÷ its published rate × 100,000. We sum those implied populations, then divide the summed charger counts by that total and multiply by 100,000. Rounded local rates make these reconstructed regional rates approximate. They match DfT’s published regional and UK rates at the precision shown [S1], [S3].
Council comparison
All counts and rates below use the same charger snapshot [S1]. The final column is public chargers per 100,000 residents. Follow your council link for the local assessment.
| Council | Chargers | Per 100k |
|---|---|---|
| Babergh | 159 | 163.9 |
| Basildon | 120 | 62 |
| Bedford | 291 | 149.2 |
| Braintree | 146 | 88.9 |
| Breckland | 167 | 113.9 |
| Brentwood | 77 | 97.1 |
| Broadland | 160 | 115.8 |
| Broxbourne | 156 | 153.1 |
| Cambridge | 467 | 312.7 |
| Castle Point | 38 | 42 |
| Central Bedfordshire | 530 | 167.8 |
| Chelmsford | 199 | 105.4 |
| Colchester | 181 | 90.4 |
| Dacorum | 257 | 159.2 |
| East Cambridgeshire | 84 | 90.4 |
| East Hertfordshire | 211 | 134.5 |
| East Suffolk | 357 | 143 |
| Epping Forest | 173 | 125.9 |
| Fenland | 56 | 53.4 |
| Great Yarmouth | 212 | 210.9 |
| Harlow | 73 | 74.3 |
| Hertsmere | 252 | 228.7 |
| Huntingdonshire | 333 | 174.7 |
| Ipswich | 413 | 294.4 |
| King’s Lynn & W. Norfolk | 269 | 172.2 |
| Luton | 155 | 64.8 |
| Maldon | 42 | 60.8 |
| Mid Suffolk | 149 | 134.5 |
| North Hertfordshire | 161 | 117.3 |
| North Norfolk | 232 | 224.8 |
| Norwich | 289 | 196.4 |
| Peterborough | 288 | 128.8 |
| Rochford | 68 | 75.7 |
| South Cambridgeshire | 353 | 204.6 |
| South Norfolk | 195 | 131.4 |
| Southend-on-Sea | 95 | 51.3 |
| St Albans | 167 | 110.6 |
| Stevenage | 178 | 194 |
| Tendring | 131 | 83.6 |
| Three Rivers | 154 | 160.7 |
| Thurrock | 208 | 114.9 |
| Uttlesford | 156 | 164 |
| Watford | 603 | 562.7 |
| Welwyn Hatfield | 430 | 350.1 |
| West Suffolk | 445 | 236.1 |
A high council rate can include infrastructure serving through traffic. A low one does not establish that your site is commercially suitable. Vehicle keepership figures describe registered locations rather than visits to your business; do not turn them directly into sessions sold [S2].
How much does public EV charging cost?
For your survey, record the total driver experience: energy price, parking fee, payment method, access hours and walking distance to your entrance. Compare these with a tariff your own customers might accept. Kilowatts (kW) describe charging power; kilowatt hours (kWh) describe energy delivered. Buying a higher power rating does not itself establish that drivers will buy more energy.
Ask for separate prices for equipment, groundwork, connection, payment services, software and maintenance. Keep a contingency for items the survey has not resolved. We have not verified a regional installed-cost benchmark, so the following figures are assumptions rather than market prices.
Are EV charging stations profitable?
This is an illustration, not a quote. It models a small destination installation, with constant annual use and no downtime. All inputs are assumptions, not observed regional performance.
| Input | Assumption |
|---|---|
| Charger power | 22 kW shared across the installation |
| Sessions daily, low / mid / high | 1 / 2 / 4 |
| Energy per session | 15 kWh |
| Driver tariff / energy cost | £0.50 / £0.25 per kWh, excluding VAT |
| Software and maintenance | £500 yearly, including assumed payment fees |
| Installed capital | £8,000–£12,000 |
| fully funded | Host pays £0; receives 10% of gross charging sales |
| part funded | Host pays £4,000–£6,000; receives 60% of operating surplus |
| self funded | Host pays full capital; receives all operating surplus |
Annual energy = sessions × 15 × 365. Sales = energy × £0.50. Operating surplus = energy × (£0.50 − £0.25) − £500. Under the part funded assumption the provider meets operating costs before splitting the surplus.
| Annual result | Low | Mid | High |
|---|---|---|---|
| Energy, kWh | 5,475 | 10,950 | 21,900 |
| fully funded host income | £274 | £548 | £1,095 |
| part funded host net income | £521 | £1,343 | £2,985 |
| part funded simple ROI | 8.7–13.0% | 22.4–33.6% | 49.8–74.6% |
| part funded payback, years | 7.7–11.5 | 3.0–4.5 | 1.3–2.0 |
| self funded host net income | £869 | £2,238 | £4,975 |
| self funded simple ROI | 7.2–10.9% | 18.6–28.0% | 41.5–62.2% |
| self funded payback, years | 9.2–13.8 | 3.6–5.4 | 1.6–2.4 |
Simple return on investment (ROI) = host net income ÷ host capital × 100. Payback = host capital ÷ host net income. Use unrounded values when recalculating. These are operating figures before tax and financing. They exclude grants, exceptional grid works, rent, business rates, replacement equipment and additional standing charges. Add those costs for your site; income can fall below this range or become negative. No host capital payback applies to fully funded.
Use the ROI and payback guide to prepare your own assumptions. Do not count extra café sales unless you can measure them separately.
Who installs EV chargers in the East of England?
Start by confirming your distribution network operator (DNO), which manages the local electricity network. UK Power Networks’ coverage map identifies the East of England; use its postcode checker for your actual connection, including sites near network boundaries [S4]. This is a network enquiry, separate from choosing an installer.
Send the surveyor your supply details and charging timetable. Ask whether a staged installation or managed charging would meet demand within the available capacity. Obtain written connection costs before committing.
For long visits, explore hotels and holiday parks. For daytime shopping stops, use farm shops and garden centres. For predictable vehicle returns, use fleets and depots. Treat these as different customer needs when requesting proposals.
What EV charging grants are available in England?
The Workplace Charging Scheme supports eligible installations up to 75% of cost, capped at £500 per socket and 40 sockets across an applicant’s sites; its closing date is 31 March 2027 [S5]. Check eligibility before assuming a public customer installation qualifies. Read the WCS guide.
HM Treasury states that qualifying chargepoint expenditure can receive a 100% first-year allowance until 31 March 2027 for corporation tax and 5 April 2027 for income tax [S7]. This is a tax deduction, not a grant cheque. Check with your accountant.
For public access, establish who carries the duties under the Public Charge Point Regulations 2023 [S6]. The guidance distinguishes workplace access from public access and sets requirements according to deployment, power and charging arrangements [S8]. Check with your solicitor. Ask for lease length, parking control, liability, business rates responsibility, exit costs and equipment removal to be written into the proposal.
Next steps
Prepare your postcode, parking layout, visitor timetable and preferred funding model. Ask for solar and battery options to be costed separately, with an explanation of how they fit your actual energy use. get matched with an installer that covers your area.
Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing your details, we name the proposed partner and disclose whether our owner holds shares in it.
Common questions
Is EV charging free?
You choose whether to subsidise charging. If you charge drivers, explain parking and energy charges separately.
Do you pay for EV charging?
A driver may pay an energy tariff and a parking fee. Check the displayed terms before charging.
How much did the chargers cost you please?
Ask for a site survey and an itemised quote. A domestic installation price is not a commercial site budget.
How do I create a workplace charging policy?
Set access, charging windows, prices and a process for moving vehicles. Agree who handles disputes.
How do you manage staff with company EVs?
Start with vehicle return times and energy needed before departure. Separate staff charging from fleet priorities.
Can I get a grant for electric car charger?
Check the Workplace Charging Scheme eligibility rather than assuming every customer charging site qualifies. [S5]
Ask about your site
Sources
- Public EV chargers by local authority (EVCI0102), Department for Transport,Last checked 16 October 2026
- Licensed plug-in vehicles by local authority (VEH0142), Department for Transport,Last checked 16 October 2026
- Public charging infrastructure, 1 July 2026, Department for Transport,Last checked 16 October 2026
- Areas we cover and distribution network map, UK Power Networks,Last checked 16 October 2026
- Workplace Charging Scheme, Office for Zero Emission Vehicles,Last checked 16 October 2026
- Public Charge Point Regulations 2023, UK legislation,Last checked 16 October 2026
- Budget 2025, capital allowances, HM Treasury,Last checked 16 October 2026
- Public Charge Point Regulations guidance, Department for Transport,Last checked 16 October 2026