Business EV charging in the West Midlands: demand and funding
The West Midlands council dataset totals 10,143 public chargers at July 2026 [S1]. Your opportunity depends on visitor dwell time, local alternatives and available electrical capacity. Compare fully funded host income with the capital, operating costs and payback under part funded or self funded proposals before committing parking bays. Checked October 2026.
How much EV charging is there in the West Midlands?
Adding the council records gives 10,143 public chargers, including 2,825 rapid-or-above chargers, at 1 July 2026 [S1]. The vehicle records total 193,174 licensed plug-in vehicles at the end of Q2 2026 [S2]. These are regional context, rather than a forecast of sessions in your car park.
The calculation sums each local-authority record tagged West Midlands once. It does not add county totals on top of district records or average council rates. The council areas are Birmingham, Bromsgrove, Cannock Chase, Coventry, Dudley, East Staffordshire, Herefordshire, Lichfield, Malvern Hills, Newcastle-under-Lyme, North Warwickshire, Nuneaton and Bedworth, Redditch, Rugby, Sandwell, Shropshire, Solihull, South Staffordshire, Stafford, Staffordshire Moorlands, Stoke-on-Trent, Stratford-on-Avon, Tamworth, Telford and Wrekin, Walsall, Warwick, Wolverhampton, Worcester, Wychavon and Wyre Forest [S1], [S2].
Use the regional data guide to understand the measures. Public devices, charging locations and parking bays are different counts. Keeper-address vehicle data can reflect company registrations away from where vehicles actually charge [S1], [S2].
Where could visitor charging meet a local need?
VisitEngland identifies destination partnerships across the metropolitan area and the surrounding counties [S9]. That suggests different surveys for an urban conference hotel and a rural visitor attraction. It does not prove that either site has an unmet charging market.
For your visitor attraction, record arrival times, length of stay and which bays remain available on event days. For a pub or restaurant, separate meal visits from overnight guests. For a workplace, count staff vehicles separately from paying visitors.
Check nearby chargers during the hours your customers visit. Record access restrictions and advertised prices, then compare them with your own parking conditions. A nearby rapid unit and an overnight destination socket may serve different trips. Keep any extra spending in your shop outside the charging forecast until you can measure it.
Which electricity network handles your installation?
National Grid Electricity Distribution covers the Midlands [S6]. SP Energy Networks also serves North Shropshire [S7]. Your distribution network operator (DNO) owns the local electricity network; identify it for your actual connection rather than using the region name alone.
Give the installer your supply details, existing peak demand, intended charger load and opening hours. Ask for a proposal with load management alongside any supply upgrade. Obtain a site-specific connection assessment before accepting a construction date. See the DNO application guide.
If you also want solar photovoltaic panels or battery storage, ask for an integrated electrical design and separate cost lines. Do not assume daytime generation meets evening charging demand. Request roof, fire-safety and planning checks for the actual proposal, including landowner consent and the loss of usable parking during construction.
What could charging cost and earn at your site?
Compare fully funded, part funded and self funded on the same demand assumptions. Fully funded means the provider pays, owns and operates while you supply the site. Part funded shares capital and income. Self funded means you buy the equipment and retain income after operating costs.
This is an illustration, not a quote. All inputs below are assumptions, rather than regional prices or usage benchmarks. kW means kilowatts of power; kWh means kilowatt-hours of energy.
| Assumed input | Value |
|---|---|
| Equipment | Four 7 kW sockets |
| Whole-site sessions/day, low / mid / high | 1 / 3 / 6 |
| Energy/session; operating days/year | 12 kWh; 365 |
| Driver price; energy cost | £0.60/kWh; £0.25/kWh |
| Software and maintenance/year | £600 |
| Installed capital, excluding major grid works | £8,000–£12,000 |
| Fully funded host share | 10% of charging sales; provider pays operating costs |
| Part funded host contribution and share | £4,000–£6,000; 50% of net income |
| Self funded host contribution and share | £8,000–£12,000; 100% of net income |
| Annual result | Low | Mid | High |
|---|---|---|---|
| Energy sold, kWh | 4,380 | 13,140 | 26,280 |
| Fully funded host income | £263 | £788 | £1,577 |
| Part funded net host income | £467 | £2,000 | £4,299 |
| Self funded net host income | £933 | £3,999 | £8,598 |
| Simple ROI, part funded and self funded | 7.8–11.7% | 33.3–50.0% | 71.7–107.5% |
| Simple payback, part funded and self funded | 8.6–12.9 years | 2.0–3.0 years | 0.9–1.4 years |
Redo the arithmetic: annual energy = sessions × 12 × 365. Sales = energy × £0.60; operating net = energy × (£0.60 − £0.25) − £600. Fully funded income = sales × 10%; part funded income = operating net × 50%. ROI = annual host net ÷ host capital × 100; payback = capital ÷ annual host net. Equal proportional contributions make the illustrated part funded and self funded returns match. Results exclude VAT, tax, finance, losses, replacement equipment and additional property costs. Use your accountant to assess those items.
Which charging grants can a West Midlands business use?
WCS offers up to £500 per eligible socket through 31 March 2027 [S3]. Check eligibility before relying on it in your budget. Our WCS guide explains the application checks.
The regional LEVI allocation is £32,755,000 [S8]. LEVI funds councils to serve residents without off-street parking [S10]. It is not a grant automatically payable to your business. Ask the relevant council about planned public installations before committing to a competing offer.
Public tariffs must show pence per kWh [S4]. Qualifying chargepoints have a 100% first-year Corporation Tax allowance through 31 March 2027 [S5]; check with your accountant.
Request written allocation of parking enforcement, liability, business rates, maintenance, lease length and exit costs. Have your solicitor check redevelopment, removal and reinstatement terms before signing.
What should you do next?
Bring your postcode, parking plan, supply information and demand assumptions to an enquiry. Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing details, we name the proposed partner and disclose any shareholding our owner holds in it. Read how we work, then get matched with an installer that covers your area.
Common questions
How should visitors pay for public charging?
Regulation 11 requires the charging price in pence per kWh. Regulation 5 specifies contactless requirements for qualifying public chargers [S4]. Include payment arrangements in your operating specification.
Can a charger count as public when the gates close overnight?
Yes. Regulation 3 includes access during specified hours [S4]. Record opening hours and check your proposed access arrangements with your solicitor.
Does company chargepoint spending qualify for tax relief?
Qualifying expenditure has a 100% first-year allowance for Corporation Tax through 31 March 2027 [S5]. Check with your accountant; an allowance is a deduction, rather than reimbursement of the equipment cost.
Is the combined authority allocation the whole regional funding pot?
No. The allocation table separates the West Midlands regional total of £32,755,000 from the combined authority allocation of £14,549,000 [S8]. Identify the authority responsible for your postcode.
Can a visitor business get help assessing local tourism demand?
VisitEngland lists partnerships covering Worcestershire, Herefordshire, Staffordshire and Stoke-on-Trent, Telford and Shropshire, and the metropolitan visitor destinations [S9]. Request destination evidence alongside your own visitor records.
Ask about your site
Sources
- Public charging infrastructure data tables EVCI0102, Department for Transport,Last checked 16 October 2026
- Licensed plug-in vehicles by local authority VEH0142, Department for Transport,Last checked 16 October 2026
- Chargepoint grant changes from April 2026, Office for Zero Emission Vehicles,Last checked 16 October 2026
- The Public Charge Point Regulations 2023, UK legislation,Last checked 16 October 2026
- First-year allowance for electric chargepoints, HM Revenue & Customs,Last checked 16 October 2026
- Distribution area finder, National Grid Electricity Distribution,Last checked 16 October 2026
- Network coverage including North Shropshire, SP Energy Networks,Last checked 16 October 2026
- LEVI regional capital allocations, Department for Transport,Last checked 16 October 2026
- Local Visitor Economy Partnership programme, VisitEngland,Last checked 16 October 2026
- LEVI funding eligibility and objectives, Department for Transport,Last checked 16 October 2026