The North East has 4,147 public chargers in the council data summed for this page [S1]. A useful business location still depends on visitor dwell time, nearby alternatives and available power. Compare fully funded income with part funded and self funded payback before committing parking space. Checked October 2026.
How much EV charging is there in the North East?
The council rows total 4,147 public chargers, including 1,023 rapid-or-above chargers, at 1 July 2026 [S1]. They also total 71,042 licensed plug-in vehicles at the end of Q2 2026 [S2]. These are sums of the local-authority dataset, rather than a count of charging locations. Do not add chargers-per-population figures together or treat the vehicle total as your customer catchment.
Council coverage is County Durham, Darlington, Gateshead, Hartlepool, Middlesbrough, Newcastle upon Tyne, North Tyneside, Northumberland, Redcar and Cleveland, South Tyneside, Stockton-on-Tees and Sunderland. These are the council areas used for the totals [S1], [S2].
Where could a North East business fill a charging gap?
Start with the visits you already receive. Durham’s city heritage, countryside and coast offer different reasons to stop [S8]. Our suggestion is to assess an overnight guest car park separately from a short-stop café, even where both sit on the same visitor route. A regional charger total cannot tell you which is viable.
The tourism partnership covers NewcastleGateshead, Northumberland and County Durham [S9]. Do not confuse that footprint with every council in this statistical region. For a Tees Valley site, collect evidence from your own visitors and the surrounding charging offer.
Record charging requests, arrival times, actual parking duration and seasonal closures. Then visit nearby chargers during your busy periods: note access restrictions, prices, broken equipment and whether customers could reasonably walk to your premises. That gives a testable proposal rather than a claim that every rural site lacks chargers. See rural charging and hotels and holiday parks.
What does EV charger installation need from the local network?
Northern Powergrid’s service territory includes the North East [S6]. DNO means distribution network operator: the organisation responsible for the local electricity network. Confirm the operator for your specific supply before submitting a connection enquiry.
Ask the surveyor to compare your measured building peak with the proposed charging load. Include kitchens, heating and planned fleet charging in the brief. Request separate prices for using the existing supply, managing charger demand and upgrading the connection. The DNO application guide explains the questions to prepare.
For solar photovoltaic (PV) panels and batteries, ask for a separate import-and-export assessment. Do not assume a sunny-day solar estimate supports overnight hotel charging. Request a roof survey, interval electricity data and a design showing what a battery would actually do.
What regional EV charging funding should you investigate?
The combined authority’s budget records £15.8 million of Local Electric Vehicle Infrastructure (LEVI) funding [S7]. This is council infrastructure funding; do not deduct it from your private-site quotation. Read the LEVI explanation.
WCS funding runs through 31 March 2027 [S3]. Confirm your eligibility before assuming a grant contribution. For any separate council solar or battery offer, obtain the current application rules and award letter; this page assumes no local business grant in its arithmetic.
Qualifying company chargepoints have a 100% first-year allowance through March 2027 [S5]. Check with your accountant.
What could charging earn, and when would it pay back?
Use your own demand evidence in the income and payback tool. The following is an illustration, not a quote. All inputs are assumptions, not regional market averages. kW means kilowatts, the charging power; kWh means kilowatt-hours, the energy sold.
| Assumed input | Value |
|---|---|
| Equipment | One 7 kW socket |
| Low / mid / high use | 1 / 2 / 3 sessions per day |
| Energy per session | 12 kWh |
| Driver price / energy cost | £0.50 / £0.25 per kWh |
| Software and maintenance | £300 per year |
| Installed capital | £4,000–£6,000; no grid upgrade |
| Fully funded host share | 10% of charging sales |
| Part funded host investment / share | £2,000–£3,000 / 50% of operating surplus |
| Self funded investment / share | £4,000–£6,000 / 100% of operating surplus |
Assume 365 trading days and available equipment throughout. Annual energy is sessions × 12 × 365. Sales equal energy × £0.50. Operating surplus equals energy × (£0.50 − £0.25) − £300.
| Annual result | Low | Mid | High |
|---|---|---|---|
| Energy sold, kWh | 4,380 | 8,760 | 13,140 |
| Fully funded host income | £219 | £438 | £657 |
| Part funded net income | £397.50 | £945 | £1,492.50 |
| Part funded simple ROI | 13.3–19.9% | 31.5–47.3% | 49.8–74.6% |
| Part funded payback, years | 5.0–7.5 | 2.1–3.2 | 1.3–2.0 |
| Self funded net income | £795 | £1,890 | £2,985 |
| Self funded simple ROI | 13.3–19.9% | 31.5–47.3% | 49.8–74.6% |
| Self funded payback, years | 5.0–7.5 | 2.1–3.2 | 1.3–2.0 |
Fully funded means the provider pays, installs, owns and operates; here it pays all operating costs and the host receives sales × 10%, with no capital payback calculation. Part funded shares capital and surplus. Self funded means you buy the equipment and retain the surplus.
For example, mid-use self funded income is 8,760 × £0.25 − £300 = £1,890. Simple return on investment (ROI) is income ÷ host capital × 100; payback is capital ÷ income. For part funded, halve the surplus first. Ranges reflect the capital range; rounding is to one decimal place. These are pre-tax cash illustrations: VAT, grants, finance, payment fees, losses, rates, insurance, downtime and replacement costs are excluded. Add them before deciding, and check tax treatment with your accountant.
How should your site handle overnight charging and parking?
For an overnight destination, write down whether a guest can remain after charging ends. For a café, decide how charging bays fit deliveries and busy meal periods. Ask for clear signs, an accessible route, fault reporting and a named party responsible for driver refunds. Customer-only access does not automatically remove public charging obligations [S4]; check with your solicitor.
Before signing, request a plan showing displaced parking and service access. Have your solicitor review landlord consent, planning responsibility, lease length, liability, business rates, removal and exit terms. Ask the installer to price reinstatement and explain who keeps the equipment if the relationship ends.
What should you do next?
Bring your postcode, parking plan, electricity bills and evidence of customer demand. Use the site check to prepare, then get matched with an installer that covers your area.
Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before passing on your details, we name the proposed partner and disclose whether our owner holds shares in it. Read how we work.
Common questions
Is there an EV charging grant for a North East workplace?
WCS offers up to £500 per socket, subject to eligibility [S3].
Does restricting charging to customers make it private?
Regulation 3 includes customer car parks within public charging [S4]. Ask your solicitor to check your access arrangements.
Is free charging the same as free parking?
No. Publish each charge separately; regulation 11 requires public charging prices in pence per kWh [S4].
Can a company claim a chargepoint tax allowance?
HMRC states that the 100% first-year allowance for qualifying chargepoints runs to 31 March 2027 for Corporation Tax [S5]. Check with your accountant.
Which tourism organisations can help a rural host?
The regional tourism partnership brings together NewcastleGateshead, Northumberland and County Durham organisations [S9]. Use their destination context alongside your own booking enquiries.
Ask about your site
Sources
- Public chargers by local authority (EVCI0102), Department for Transport,Last checked 16 October 2026
- Licensed plug-in vehicles by local authority (VEH0142), Department for Transport,Last checked 16 October 2026
- Chargepoint grant changes from April 2026, Office for Zero Emission Vehicles,Last checked 16 October 2026
- The Public Charge Point Regulations 2023, UK legislation,Last checked 16 October 2026
- Corporation Tax service and first-year allowances, HM Revenue & Customs,Last checked 16 October 2026
- Northern Powergrid customer engagement report: service area, Northern Powergrid,Last checked 16 October 2026
- Draft budget and medium-term financial plan, North East Combined Authority,Last checked 16 October 2026
- Durham destination guide, VisitBritain,Last checked 16 October 2026
- Major boost for North East tourism, Department for Culture, Media and Sport,Last checked 16 October 2026