Business EV charging in Yorkshire and the Humber

Yorkshire and the Humber's council rows sum to 6,281 public chargers [S1]. For your business, the useful question is whether visitors can charge during their normal stop. Combine a local parking survey with network checks and a seasonal income model before choosing fully funded, part funded or self funded equipment. Checked October 2026.

Last checked 16 October 2026

How much EV charging is already in Yorkshire and the Humber?

The local-authority data totals 6,281 public chargers, including 2,075 rapid-or-above chargers, at 1 July 2026 [S1]. The same council footprint totals 239,497 licensed plug-in vehicles at Q2 2026 [S2]. These are regional sums, not a measure of use at your car park. Check the regional data guide alongside a survey of nearby facilities.

The included council areas are Barnsley, Bradford, Calderdale, Doncaster, East Riding of Yorkshire, Kingston upon Hull, Kirklees, Leeds, North East Lincolnshire, North Lincolnshire, North Yorkshire, Rotherham, Sheffield, Wakefield and York [S1], [S2]. North Lincolnshire and North East Lincolnshire belong in this regional total; do not add the whole of Lincolnshire to it.

Where could Yorkshire business charging meet visitor demand?

The region’s visitor partnerships cover urban and rural destinations [S9].

VisitBritain’s regional destination guide covers York, the Yorkshire Dales, Bradford, the North York Moors and Hull [S8]. Those different visits suggest different survey questions. An overnight stay, a museum visit and a meal stop should not share an assumed charging turnover.

For a York accommodation business, record overnight charging requests and whether guests can leave cars in place. For a coast or moors attraction, compare seasonal parking duration with winter opening. For a West Yorkshire workplace, start with staff attendance and vehicle needs rather than visitor forecasts. These are suggested assessment routes, not evidence that a particular locality lacks chargers.

Ask customers about energy needed on departure, not just whether they own an electric car. Then inspect alternatives for opening hours, availability and walking access. Use dwell time and charger speed to develop the equipment brief. For rural premises, compare farm and rural business needs with visitor attractions.

What should an installation enquiry ask the electricity network?

Northern Powergrid’s service territory includes Yorkshire and northern Lincolnshire [S6]. DNO means distribution network operator, the organisation responsible for the local electricity network. Confirm the supply address rather than assuming that a council boundary determines your connection.

Prepare your present electricity demand and proposed charging schedule. Ask the designer to test simultaneous building and vehicle demand, including heating or process loads. Request a priced option for managed charging alongside any proposed connection upgrade. The DNO application guide helps you prepare the brief.

For solar photovoltaic (PV) panels and batteries, request a separate generation and storage assessment. A warehouse’s daytime energy use and a hotel’s overnight charging demand need different models. Ask for roof condition, shading, export assumptions and battery losses in the calculation; a regional location alone cannot establish solar yield or battery payback.

What regional charging funds and business grants apply?

West Yorkshire’s LEVI programme has £14.3 million of further capital funding, alongside its pilot award, for residential charging near homes without off-street parking [S7]. That programme covers West Yorkshire, not every council listed above. Do not treat a public programme allocation as an award to your business.

WCS funding runs to 31 March 2027 [S3]. Check the workplace grant guide against the intended users. No local solar or battery grant enters this example. Qualifying company chargepoints have a 100% first-year allowance through March 2027 [S5]. Check with your accountant.

What could charging earn, and when would it pay back?

Use your own demand evidence in the income and payback tool. The following is an illustration, not a quote. All inputs are assumptions, not regional market averages. kW means kilowatts, the charging power; kWh means kilowatt-hours, the energy sold.

Assumed input Value
Equipment One 7 kW socket
Low / mid / high use 1 / 2 / 3 sessions per day
Energy per session 12 kWh
Driver price / energy cost £0.50 / £0.25 per kWh
Software and maintenance £300 per year
Installed capital £4,000–£6,000; no grid upgrade
Fully funded host share 10% of charging sales
Part funded host investment / share £2,000–£3,000 / 50% of operating surplus
Self funded investment / share £4,000–£6,000 / 100% of operating surplus

Assume 365 trading days and available equipment throughout. Annual energy is sessions × 12 × 365. Sales equal energy × £0.50. Operating surplus equals energy × (£0.50 − £0.25) − £300.

Annual result Low Mid High
Energy sold, kWh 4,380 8,760 13,140
Fully funded host income £219 £438 £657
Part funded net income £397.50 £945 £1,492.50
Part funded simple ROI 13.3–19.9% 31.5–47.3% 49.8–74.6%
Part funded payback, years 5.0–7.5 2.1–3.2 1.3–2.0
Self funded net income £795 £1,890 £2,985
Self funded simple ROI 13.3–19.9% 31.5–47.3% 49.8–74.6%
Self funded payback, years 5.0–7.5 2.1–3.2 1.3–2.0

Fully funded means the provider pays, installs, owns and operates; here it pays all operating costs and the host receives sales × 10%, with no capital payback calculation. Part funded shares capital and surplus. Self funded means you buy the equipment and retain the surplus.

For example, mid-use self funded income is 8,760 × £0.25 − £300 = £1,890. Simple return on investment (ROI) is income ÷ host capital × 100; payback is capital ÷ income. For part funded, halve the surplus first. Ranges reflect the capital range; rounding is to one decimal place. These are pre-tax cash illustrations: VAT, grants, finance, payment fees, losses, rates, insurance, downtime and replacement costs are excluded. Add them before deciding, and check tax treatment with your accountant.

How should you manage community access and overnight parking?

If you want to open a workplace car park to nearby residents, write down the proposed hours and access rules before obtaining an operating proposal. Customer car parks can fall within public charging rules [S4]. Ask your solicitor to review classification, liability and the obligations allocated to each party.

For an overnight destination, state whether cars must move when charging finishes. For an attraction, show how EV bays affect peak-day parking, coach access and deliveries. Request clear signs, accessible pedestrian routes and a procedure for equipment faults.

Have your solicitor check the term, landlord permission, planning responsibility, insurance, rates and exit. Ask what happens to equipment and buried cables if the operator leaves. Seek written maintenance and reinstatement commitments as part of the commercial comparison.

What should you do next?

Bring your postcode, site plan, supply information and seasonal demand evidence to an installer discussion. Compare the result using the income tool, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before passing on your details, we name the proposed partner and disclose whether our owner holds shares in it. Read how we work.

Common questions

How much WCS support can a Yorkshire employer receive?

The WCS cap is £500 per eligible socket [S3].

Does a guest-only car park avoid public charging rules?

Not automatically. Regulation 3 includes customer car parks [S4]. Ask your solicitor to classify the intended use before agreeing operating duties.

Can chargepoint investment qualify for a tax allowance?

HMRC confirms a 100% first-year allowance for qualifying chargepoints through 31 March 2027 for Corporation Tax [S5]. Check with your accountant.

How should a host display a charging price?

Regulation 11 uses pence per kWh for public charging prices [S4]. Show parking charges separately so visitors can understand the total.

Where can a Yorkshire tourism business find destination support?

VisitEngland lists Hull and East Yorkshire, South Yorkshire, West Yorkshire, and York and North Yorkshire partnerships [S9]. Identify the partnership covering your premises before seeking local support.

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Public chargers by local authority (EVCI0102), Department for Transport,Last checked 16 October 2026
  2. Licensed plug-in vehicles by local authority (VEH0142), Department for Transport,Last checked 16 October 2026
  3. Chargepoint grant changes from April 2026, Office for Zero Emission Vehicles,Last checked 16 October 2026
  4. The Public Charge Point Regulations 2023, UK legislation,Last checked 16 October 2026
  5. Corporation Tax service and first-year allowances, HM Revenue & Customs,Last checked 16 October 2026
  6. Northern Powergrid customer engagement report: service area, Northern Powergrid,Last checked 16 October 2026
  7. Local Electric Vehicle Infrastructure fund, West Yorkshire Combined Authority,Last checked 16 October 2026
  8. Yorkshire and the Humber visitor destinations, VisitBritain,Last checked 16 October 2026
  9. Local Visitor Economy Partnership programme, VisitEngland,Last checked 16 October 2026
Check your site