Business EV charging in Stevenage: workplace or public bays?

Stevenage had 178 public chargers on 1 July 2026 [S1]. Both total and rapid charger provision per resident exceeded the regional and UK comparisons. A workplace scheme should therefore begin with staff needs and parking turnover, while a public scheme needs a clear reason for drivers to choose your premises. Checked October 2026.

Last checked 17 October 2026

How should you organise shared charging at a Stevenage workplace?

Begin with a staff survey and vehicle schedule, rather than an equipment catalogue. Ask which drivers lack another practical charging option, when vehicles arrive and whether they leave during the day. Separate fleet vehicles needed for work from private commuting.

Stevenage’s climate action plan encourages workplace charging and also records neighbourhood provision at Bedwell Shops and The Hyde, among other locations [S4]. Your staff may have alternatives, but only their actual travel pattern can establish whether those alternatives work. A written booking and bay-release policy makes a small installation easier to assess.

Use the workplace sector guidance for the employer route. If you intend to sell charging to visitors, review retail charging separately; different users need different access arrangements.

How does Stevenage compare with the region and UK?

The supplied DfT council records give the following comparison [S1].

Provision, 1 July 2026 Stevenage East of England UK
Public chargers 178 9,880 121,171
Public chargers per 100,000 people 194.0 150.2 174.9
Rapid chargers 79 3,210 28,887
Rapid chargers per 100,000 people 86.1 48.8 41.7

For the regional and UK calculations, estimate each authority’s population from its public count ÷ its rate × 100,000. Divide aggregated chargers by aggregated population and multiply by 100,000. Rates are approximate because council inputs are rounded. The regional charging page supplies context beyond the borough.

Stevenage recorded 2,259 plug-in vehicles in 2026 Q2, including 1,411 battery electric vehicles. The privately kept plug-in count was 1,798 [S2]. A keeper’s address is not evidence of where a car charges, and these categories must not be added together.

What could charging cost and earn during working hours?

The following is an illustration, not a quote. Kilowatts (kW) describe charging power; kilowatt hours (kWh) describe purchased energy. Assume alternating-current (AC) charging during an ordinary working schedule, without public weekend sales.

Single 7 kW workplace units have a published cost range of £1,400–£2,500 each [S8]. For this four-unit model, add an assumed £2,400–£4,000 for groundworks, cable runs and connection. That gives £8,000–£14,000 total. Infrastructure costs require separate scrutiny [S9]; an unpriced supply upgrade would increase this budget.

Input Illustration assumption
Equipment 4 × 7 kW alternating-current (AC) chargers
Sessions across the site, low / mid / high 2 / 4 / 6 per operating day
Operating days / energy per session 250 yearly / 14 kWh
Driver tariff / purchased electricity £0.45 / £0.25 per kWh
Software, maintenance and payment fees £600 per year combined
Total capital / host’s part funded capital £8,000–£14,000 / £4,000–£7,000
fully funded / part funded / self funded host share 10% of sales / 50% of net / 100% of net
Annual result Low use Mid use High use
Energy sold, kWh 7,000 14,000 21,000
fully funded host income £315 £630 £945
part funded host net income £400 £1,100 £1,800
self funded host net income £800 £2,200 £3,600
Simple ROI, part funded and self funded 5.7–10.0% 15.7–27.5% 25.7–45.0%
Payback, part funded and self funded, years 10.0–17.5 3.6–6.4 2.2–3.9

Calculate annual energy as sessions × 250 × 14. Net operating income = energy × (£0.45 − £0.25) − £600. Fully funded pays the host 10% of sales, with the provider meeting equipment and running costs. Part funded assigns half the investment and half the net to you. Self funded assigns both in full.

ROI means simple return on investment: annual host net ÷ host investment × 100. Payback is investment ÷ annual host net. Identical proportions make the part funded and self funded percentages equal in this example. Tariffs, utilisation, shares and running costs are assumptions, excluding VAT. The calculation omits grants, tax, borrowing, faults and replacements. Test another schedule with the payback calculator.

Why does infrastructure dominate some workplace quotes?

UK Power Networks’ coverage map includes this area. Confirm the address before contacting the distribution network operator (DNO), which manages your local distribution cables [S3]. Give the assessor building demand alongside the planned charging hours.

Ask whether shared power can serve the required departures and what happens when every bay is occupied. A roof solar proposal should show charging demand against generation over time; battery storage needs its own cost and operating model. Do not insert unverified savings into the charger return.

The survey should also mark pedestrian access, cable routes and parking displaced. Ask the council to confirm planning requirements for the actual design. Before signing a lease, have your solicitor check landlord and lender consent, redevelopment rights, exit costs, insurance and business rates responsibilities.

Which grants and access rules affect the proposal?

Eligible WCS installations can receive up to £500 per socket, subject to the percentage cap and applicant limits, through 31 March 2027 [S5]. Keep a customer-facing sales model separate from grant eligibility checks.

HMRC includes new, unused chargepoint equipment bought before April 2027 in first-year allowance eligibility [S7]. Check with your accountant before relying on a deduction. Workplace access and public customer access are treated differently by the Public Charge Point Regulations 2023 [S6]; ask your solicitor to classify the proposed operation.

Next step

Prepare a staff charging schedule and a marked parking plan, then get matched with an installer that covers your area.

This site is operated by Piggy Pineapple Ltd. We refer enquiries to installer partners and may receive a fee. Our owner has shares in at least one partner; we name the proposed recipient and disclose the owner’s shareholding in it before passing on your details.

How many plug-in vehicles share each public charger here?

Stevenage has 10.1 privately kept plug-in vehicles for every public charger, ranked 284 of 357 UK councils (1 = most vehicles per charger). The UK figure is 13.1; the middle council has 17.8.

That is fewer than most councils: the public network here is already relatively dense, so a new site needs a clear reason drivers will stop, such as dwell time or a customer offer.

Vehicles are counted where the keeper lives, and drivers with a driveway often charge at home. Use this as a first screen, not a forecast. Chargers as at 1 July 2026; vehicles as at 2026 Q2.

See every council ranked, or check your own site by postcode.

Common questions

How many workplace sockets can your organisation claim for?

WCS has a cumulative limit of 40 sockets across an applicant's sites. Count previous claims before submitting another application. [S5]

Can you install before receiving a grant voucher?

Apply and obtain your voucher before installation. Eligible equipment must then be installed and claimed within the voucher's validity period. [S5]

Should completed vehicles move out of charging bays?

Write a bay-release rule and display it with your access arrangements. Regulation 3 distinguishes workplace users from customers; identify the group before setting the policy. [S6]

Is the chargepoint allowance a repayment of your invoice?

No. The first-year allowance deducts qualifying expenditure from taxable profits. Ask your accountant how this affects your business. [S7]

Which quote items are easy to overlook?

Request separate lines for terminals, mounting posts, protective barriers, signs and bay markings; these are identified in the commercial cost guide. [S9]

Does the council plan cover neighbourhood shopping areas?

Its TR5 action records charging provision at Bedwell Shops, The Hyde, Oaks Cross, Archer Road, Filey Close and St Nicholas Park. [S4]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Public EV chargers by local authority, EVCI0102, Department for Transport,Last checked 17 October 2026
  2. Vehicle licensing statistics, VEH0142, Department for Transport,Last checked 17 October 2026
  3. Areas we cover and network map, UK Power Networks,Last checked 17 October 2026
  4. TR5 Deployment of public Electric Charging Infrastructure, Stevenage Borough Council,Last checked 17 October 2026
  5. Workplace Charging Scheme, installer guidance, Office for Zero Emission Vehicles,Last checked 17 October 2026
  6. Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
  7. 100% first-year allowances, HM Revenue and Customs,Last checked 17 October 2026
  8. EV Charger Installation Cost UK 2026: Commercial vs Domestic, Commercial cost article,Last checked 17 October 2026
  9. Commercial EV charger installation cost: your 2026 UK guide, Commercial cost guide,Last checked 17 October 2026
Check your site