Could your Redcar and Cleveland site earn from EV charging?
Redcar and Cleveland had 143 public chargers on 1 July 2026 [S1]. A later council update reports further local rollout, so check competing locations before investing. Your parking duration, electricity supply and repeat users matter more than the borough total. Compare the annual host income from fully funded charging with the investment risk of other models. Checked October 2026.
What does the latest rollout mean for your car park?
The council’s September 2026 update reports live rapid charging at Fountain Street East in Guisborough and installations in Eston, Brotton, Skelton, Loftus and Redcar. It identifies Saltburn, Kirkleatham and Carlin How as locations still to come. That announcement follows the statistical snapshot below; do not add it to the total without checking which devices the dataset already includes. [S3]
For your Eston premises or Redcar business, inspect alternatives on the route into your car park. Record their opening hours, parking charges and occupied bays. Nearby installations are a reason to test your offer carefully, rather than evidence that your site will attract paying sessions.
Separate visitor charging from employee charging. A pub or café can record customer stays; an office can survey repeat commuting needs. Count observed demand before reserving spaces. Use the Middlesbrough workplace charging example to compare employee demand with your visitor assumptions.
How does Redcar and Cleveland compare with the North East?
The Department for Transport snapshot for 1 July 2026 records 143 public chargers, of which 33 are rapid. [S1]
| Geography | Public chargers per 100,000 | Rapid chargers per 100,000 |
|---|---|---|
| Redcar and Cleveland | 102.7 | 23.7 |
| North East | 150.2 | 37.1 |
| UK | 174.9 | 41.7 |
Regional and national rates are approximate calculations from the council dataset. Population for each council is inferred as charger count ÷ published density × 100,000. Sum those populations and counts before dividing; do not average the council rates. Rounded inputs limit precision. [S1] Explore the North East context.
In 2026 Q2, the borough had 2,862 plug-in vehicles, including 1,996 battery electric vehicles and 2,261 privately kept plug-ins. The overlapping categories should not be added. Keeper-address counts indicate local ownership, rather than the number of vehicles passing your entrance. [S2]
What could a modest workplace installation cost and earn?
Consider a workplace starting with a single alternating current (AC) charger. Kilowatts (kW) describe power; kilowatt-hours (kWh) describe delivered energy. This is an illustration, not a quote.
| Input | Sourced range or explicit assumption |
|---|---|
| Equipment | One 7 kW AC workplace charger |
| Installed charger cost | £1,400–£2,500 [S8] |
| Extra site works | £1,000 groundworks/cables; £600 connection, assumed |
| Total capital | £3,000–£4,100; no main supply upgrade assumed |
| Low / mid / high use | 0.5 / 1 / 1.5 sessions daily, across 250 days |
| Energy each session | 14 kWh assumed |
| Driver price / energy cost | £0.45 / £0.25 per kWh, excluding VAT, assumed |
| Software and maintenance | £300 yearly assumed |
| fully funded host share | 10% of sales assumed |
| part funded arrangement | Half the capital; 60% of operating surplus assumed |
Groundworks, cable runs and connection costs are extra to the charger range. The allowances above are placeholders, not a surveyed scope. The commercial references explain equipment and wider installation costs. [S8], [S9]
| Yearly host result | Low | Mid | High |
|---|---|---|---|
| fully funded income | £79 | £158 | £236 |
| part funded net income | £30 | £240 | £450 |
| part funded ROI | 1.5–2.0% | 11.7–16.0% | 22.0–30.0% |
| part funded payback, years | 50.0–68.3 | 6.3–8.5 | 3.3–4.6 |
| self funded net income | £50 | £400 | £750 |
| self funded ROI | 1.2–1.7% | 9.8–13.3% | 18.3–25.0% |
| self funded payback, years | 60.0–82.0 | 7.5–10.3 | 4.0–5.5 |
Sales = sessions/day × 250 × 14 × £0.45. Operating surplus = sessions/day × 250 × 14 × (£0.45 − £0.25) − £300. Host income for fully funded charging is sales × 10%, rounded to pounds, with energy and upkeep paid by the provider. It funds, installs, owns and operates the equipment; you supply the space.
Part funded means £1,500–£2,050 from you and an assumed 60% surplus share, with ownership negotiated. Self funded means paying the whole capital cost and retaining the surplus. Return on investment (ROI) is annual host net ÷ host investment × 100; payback is investment ÷ annual net.
The long low-use payback is a warning about weak demand, not a useful equipment-life forecast. These calculations exclude tax, grants, finance, losses, payment fees, standing charges, rates and replacement. Include them in your income and payback calculation.
Which supply, grant and contract checks come first?
Use Northern Powergrid’s licence-area map to identify the distribution network operator (DNO) serving the area, then confirm your premises and capacity. A map boundary cannot establish the headroom at your meter. [S4]
The Workplace Charging Scheme offers eligible applicants up to 75% of purchase and installation cost, capped at £500 per socket and 40 sockets across their sites, until 31 March 2027. Obtain the voucher before installation; do not treat general customer charging as automatically eligible. [S5]
Ask the council to review the proposed layout for planning constraints. Walk the accessible route and measure the ordinary parking displaced. Before signing, have your solicitor examine lease length, liability, insurance, redevelopment, removal and exit terms. Ask who takes responsibility for business rates; price that allocation before accepting a revenue share.
Tax relief changes the investment calculation, not sales; check qualifying expenditure with your accountant. [S6] Customer access can trigger public charging duties; agree operator responsibilities with your solicitor. [S7]
Next step for your site
Prepare a bay plan, demand observations and your electricity bill, then get matched with an installer that covers your area.
This referral service is operated by Piggy Pineapple Ltd. We may receive a fee for referring your enquiry to installer partners. Our owner has shares in at least one partner; before sharing your details we identify the selected partner and disclose any shareholding in it. See how referrals work.
How many plug-in vehicles share each public charger here?
Redcar and Cleveland has 15.8 privately kept plug-in vehicles for every public charger, ranked 205 of 357 UK councils (1 = most vehicles per charger). The UK figure is 13.1; the middle council has 17.8.
That is fewer than most councils: the public network here is already relatively dense, so a new site needs a clear reason drivers will stop, such as dwell time or a customer offer.
See every council ranked, or check your own site by postcode.
Common questions
How should you compare installation quotations?
Use the same parking plan for each quotation and request separate groundworks, cables, connection and commissioning lines. An installed charger price does not describe the entire site project. [S9]
Which recurring costs need a budget?
Include electricity, software, servicing and payment handling. The illustration allows £300 yearly for software and maintenance only; obtain separate prices for the other items before relying on its results. [S9]
Can capital allowances replace charging revenue?
No. HMRC describes a 100% first-year allowance for qualifying chargepoints, with expiry dates of 31 March 2027 for Corporation Tax and 5 April 2027 for Income Tax. Check the tax treatment with your accountant. [S6]
Does limiting access to customers avoid public charging rules?
Not necessarily. The public charging definition can include customers and restricted opening hours. Identify the operator and allocate pricing, payment and support duties with your solicitor before opening. [S7]
What should the installation programme include?
Request a sequence covering supply assessment, permissions, design, groundworks and commissioning. Connection work can change delivery time; ask for milestones tied to the assessed scope. [S9]
Ask about your site
Sources
- Public EV chargers by local authority, EVCI0102, Department for Transport,Last checked 17 October 2026
- Licensed plug-in vehicles by local authority, VEH0142, Department for Transport,Last checked 17 October 2026
- Local rapid charging rollout update, Redcar and Cleveland Borough Council,Last checked 17 October 2026
- All DNO Licence Area Boundaries map, Northern Powergrid,Last checked 17 October 2026
- Workplace Charging Scheme guidance for installers, Office for Zero Emission Vehicles,Last checked 17 October 2026
- Capital allowances extension for electric vehicle chargepoints, HM Revenue and Customs,Last checked 17 October 2026
- Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
- Workplace and rapid charger installation cost ranges, Commercial installation cost reference,Last checked 17 October 2026
- Commercial installation costs and project questions, Commercial installation cost reference,Last checked 17 October 2026