Would EV charging earn income at your North Tyneside site?

North Tyneside had 133 public chargers on 1 July 2026 [S1]. That borough total cannot tell you whether your car park will earn charging income. Check nearby alternatives, parking duration and supply costs, then compare fully funded host income with the investment and payback of part funded or self funded charging. Checked October 2026.

Last checked 17 October 2026

What local demand should your charging income plan test?

North Tyneside’s Zero Emission Vehicles strategy describes charging at shopping centres, business parks and Metro stations. It also proposes off-street hubs where terraced streets lack private parking and the commercial market does not provide a solution. These are strategy intentions, not evidence that a particular hub has opened. [S3]

Test repeat evening demand: record parking stays and whether neighbours could use bays after closing.

For a site in Longbenton or Wallsend, map alternatives around the actual entrance. A workplace should first establish staff demand. For Tynemouth, test guest and visitor parking separately: the council strategy identifies charging confidence as relevant to the visitor economy. [S3] The accommodation guide helps frame that enquiry. Include the Newcastle upon Tyne charging assessment when checking alternatives across the council boundary.

How much competition does the borough-wide charger count suggest?

On 1 July 2026, North Tyneside had 133 public chargers, including 55 rapid chargers. [S1]

Geography Public chargers per 100,000 people Rapid chargers per 100,000
North Tyneside 61.9 25.6
North East 150.2 37.1
UK 174.9 41.7

Regional and UK comparisons are calculated from the retained council dataset: infer each population as public chargers ÷ published density × 100,000; sum counts and inferred populations, then divide. Rounded source densities make the comparisons approximate. [S1] See the regional overview.

Lower density does not establish utilisation. Check nearby opening hours, tariffs and parking restrictions.

The 2026 Q2 licensing snapshot records 5,854 plug-in vehicles, including 4,145 battery electric vehicles; 4,440 plug-ins were privately kept. These categories overlap. Registrations do not measure passing traffic; the reporting periods differ. [S2]

What could a small AC installation cost and earn?

This is an illustration, not a quote, for a business car park with repeat users. Alternating current (AC) charging suits the longer stays assumed here. Kilowatts (kW) measure power; kilowatt-hours (kWh) measure energy. Use your own observed parking stays before choosing equipment. [S9]

Input Value or assumption
Chargers Five 7 kW AC units
Installed units £1,200–£2,000 each for a multi-unit workplace site [S8]
Shared infrastructure £3,000–£8,000 [S8]
Extra groundworks and cables £4,000 assumed, additional to those ranges
Extra connection work £2,000 assumed; no main supply upgrade
Total capital £15,000–£24,000, using the inputs above
Low / mid / high daily use 2 / 4 / 6 sessions across the entire site
Energy and operating days 12 kWh per session; 300 days yearly
Driver price / electricity £0.50 / £0.25 per kWh, excluding VAT
Software and maintenance £600 yearly assumed
Fully funded share 10% of sales assumed
Part funded contribution/share Half the capital; 60% of operating surplus assumed

Groundworks, cable runs and connection are extra; the allowances above are placeholders requiring a survey. The commercial references distinguish installation scope from infrastructure and ongoing charges. [S8], [S9]

Annual host outcome Low use Mid use High use
fully funded: income £360 £720 £1,080
part funded: net income £720 £1,800 £2,880
part funded: simple ROI 6.0–9.6% 15.0–24.0% 24.0–38.4%
part funded: payback years 10.4–16.7 4.2–6.7 2.6–4.2
self funded: net income £1,200 £3,000 £4,800
self funded: simple ROI 5.0–8.0% 12.5–20.0% 20.0–32.0%
self funded: payback years 12.5–20.0 5.0–8.0 3.1–5.0

Sales = daily sessions × 12 × 300 × £0.50. Operating surplus = daily sessions × 12 × 300 × (£0.50 − £0.25) − £600.

With fully funded charging, the provider pays, installs, owns and operates; you provide bays and receive the assumed sales share. Part funded means your £7,500–£12,000 contribution buys the assumed surplus share, with ownership agreed in writing. Self funded means you pay all capital and retain the operating surplus.

Simple return on investment (ROI) = annual host net ÷ host capital × 100; payback years = host capital ÷ annual net. These pre-tax results exclude grants, finance, payment fees, electrical losses, standing charges, rates, land rent and replacements. Add those before deciding; lower use can produce a loss. Try the income and payback tool.

Which checks come before a funding agreement?

Northern Powergrid is the local distribution network operator (DNO), responsible for electricity distribution. Use its licence-area map, then confirm the premises’ connection and available capacity. A coverage boundary does not establish spare power. [S4]

The Workplace Charging Scheme covers up to 75% of eligible costs, capped at £500 per socket and 40 sockets across an applicant’s sites, and runs until 31 March 2027. Apply through the voucher process before installation. [S5]

Capital allowances affect tax, not turnover; check qualifying expenditure with your accountant. [S6] Customer-only access can still fall within public charging rules; identify operator responsibilities with your solicitor. [S7]

Ask the council about planning constraints for your layout. Agree accessible routes and the loss of ordinary parking space before reserving bays. The council strategy specifically includes disabled access in charging design considerations. [S3] Ask your solicitor to review lease duration, liability, redevelopment, exit costs and reinstatement; allocate business rates responsibility in the contract.

Next step for your North Tyneside site

Bring a parking plan, electricity bill and observed use pattern, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before passing on details, we name the proposed partner and disclose whether the owner holds shares in it. Read how we work.

How many plug-in vehicles share each public charger here?

North Tyneside has 33.4 privately kept plug-in vehicles for every public charger, ranked 32 of 357 UK councils (1 = most vehicles per charger). The UK figure is 13.1; the middle council has 17.8.

That is more than most councils, which can point to demand that public charging does not yet meet, especially where many homes have no driveway.

Vehicles are counted where the keeper lives, and drivers with a driveway often charge at home. Use this as a first screen, not a forecast. Chargers as at 1 July 2026; vehicles as at 2026 Q2.

See every council ranked, or check your own site by postcode.

Common questions

How should you compare installation quotes?

Request separate lines for chargers, cable routes, groundworks, connection work, commissioning and payment equipment. Check exclusions against the same site plan before comparing totals. [S9]

What maintenance should your charging budget include?

Ask whether servicing covers electrical checks, fault callouts and firmware updates, and whether software subscriptions are separate. The example assumes £600 yearly for software and maintenance, not a market quote. [S9]

Can customers use chargers funded through the workplace scheme?

Eligibility depends on the applicant and intended use. Staff and fleet charging is the usual workplace route; small accommodation businesses have specific provisions. Check the applicable conditions before applying for a voucher or including customer charging in your plan. [S5]

Is a capital allowance the same as a cash grant?

No. HMRC describes a 100% first-year allowance against qualifying expenditure, with deadlines of 31 March 2027 for Corporation Tax and 5 April 2027 for Income Tax. Check eligibility and treatment with your accountant; it is not charging income. [S6]

Does customer-only access remove public charging duties?

No. The public charging definition can include access limited to customers or particular opening hours. Identify the operator and check which payment, pricing and support duties apply before opening. Have your solicitor review the responsibilities. [S7]

Can a larger connection cost change the charging business case?

Yes. The published main supply upgrade range is £40,000–£150,000 where needed. That is separate from charger costs and far above this illustration's assumed connection allowance. Obtain a connection scope before using the payback figures. [S8]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Public EV chargers by local authority, EVCI0102, Department for Transport,Last checked 17 October 2026
  2. Licensed plug-in vehicles by local authority, VEH0142, Department for Transport,Last checked 17 October 2026
  3. North Tyneside Zero Emission Vehicles Strategy, North Tyneside Council,Last checked 17 October 2026
  4. All DNO Licence Area Boundaries map, Northern Powergrid open data,Last checked 17 October 2026
  5. Workplace Charging Scheme guidance for installers, Office for Zero Emission Vehicles,Last checked 17 October 2026
  6. First-year allowances for electric vehicle chargepoints, HM Revenue and Customs,Last checked 17 October 2026
  7. Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
  8. Workplace charger and infrastructure cost ranges, Commercial installation cost reference,Last checked 17 October 2026
  9. Commercial installation scope and operating costs, Commercial installation cost reference,Last checked 17 October 2026