How should your Stockton-on-Tees business plan EV charging?

Stockton-on-Tees had 275 public chargers on 1 July 2026 [S1]. The borough's provision is below the regional and UK density comparisons, but your site's case still needs observed demand and a power assessment. Consider workplace charging alongside wider energy plans, then compare annual host income and payback under the three funding models. Checked October 2026.

Last checked 17 October 2026

Can charging fit your wider site energy plan?

Stockton’s environmental strategy links expansion of the borough and Tees Valley charging network with renewable generation and assessing battery storage. It describes policy objectives, not a funded installation offer for your business. [S3]

Request a combined load assessment for chargers, solar photovoltaic (PV) panels and storage. Do not assign the same solar output to both building consumption and vehicle sales.

A Billingham workplace with repeat users should build its plan around their actual charging needs. The workplace sector page and industrial premises page help frame different enquiries. For a retail car park, begin by observing customer stays and nearby alternatives. Teesside Park already advertises charging on its premises, providing a concrete local alternative to inspect, rather than assuming the retail market is unserved. [S10]

What do Stockton’s vehicle and charger figures tell you?

In 2026 Q2, Stockton-on-Tees recorded 5,639 plug-in vehicles, including 3,858 battery electric vehicles. Of the plug-ins, 4,432 were privately kept. Those categories overlap. Vehicles are allocated by keeper address; they do not establish the demand at an individual industrial estate or shopping destination. [S2]

The public charging snapshot is 1 July 2026: 275 public chargers, including 65 rapid chargers. [S1]

Geography Public chargers per 100,000 people Rapid chargers per 100,000
Stockton-on-Tees 133.0 31.4
North East 150.2 37.1
UK 174.9 41.7

To calculate the comparison, infer each council population from public chargers ÷ public chargers per 100,000 × 100,000. Sum populations and charger counts, then divide the totals. Rounding in the council densities makes these regional and UK results approximate. [S1] Compare the North East overview.

Neither lower density nor more registered vehicles tells you whether customers will pay your proposed tariff. Keep staff survey responses separate from assumed passing trade.

What would a shared workplace installation cost and return?

The scenario below uses six alternating current (AC) chargers. Kilowatts (kW) describe power; kilowatt-hours (kWh) measure energy. It is an illustration, not a quote, with use measured across the whole installation.

Input Range or assumption
Charger power Six 7 kW AC units
Installed charger range £1,200–£2,000 each for a multi-unit site [S8]
Shared infrastructure £3,000–£8,000 [S8]
Extra groundworks/cable runs £3,000 assumed
Extra connection work £1,800 assumed; no main upgrade
Total capital £15,000–£24,800
Low / mid / high sessions daily 3 / 6 / 9 across 300 operating days
Energy per session 10 kWh assumed
Driver price / electricity £0.50 / £0.25 per kWh, excluding VAT, assumed
Software and maintenance £900 a year assumed
fully funded revenue share 10% of sales assumed
part funded contribution/share Half of capital; 60% of operating surplus assumed

Groundworks, cable runs and connection are extras, separately allowed for here. A longer cable route or supply reinforcement can move your actual cost beyond this illustration. Check scope against the commercial installation references. [S8], [S9]

Annual result for your site Low Mid High
fully funded income £450 £900 £1,350
part funded net income £810 £2,160 £3,510
part funded ROI 6.5–10.8% 17.4–28.8% 28.3–46.8%
part funded payback, years 9.3–15.3 3.5–5.7 2.1–3.5
self funded net income £1,350 £3,600 £5,850
self funded ROI 5.4–9.0% 14.5–24.0% 23.6–39.0%
self funded payback, years 11.1–18.4 4.2–6.9 2.6–4.2

Sales = sessions/day × 300 × 10 × £0.50. Operating surplus = sessions/day × 300 × 10 × (£0.50 − £0.25) − £900.

Fully funded assumes the provider finances, installs, owns and runs the chargers, paying energy and upkeep. You supply bays for the assumed sales share. Part funded requires £7,500–£12,400 from you for the assumed surplus share, with ownership settled in the agreement. Self funded gives you the entire surplus after your full capital contribution.

Return on investment (ROI) = yearly net to host ÷ host capital × 100. Payback years = host capital ÷ yearly net. Both calculations exclude grants, tax, borrowing, payment fees, losses, standing charges, rates and replacement costs. Test these omitted expenses and lower demand in the income calculator.

What must be settled before you reserve parking bays?

Check Northern Powergrid’s licence-area map, then confirm your supply with the distribution network operator (DNO). The boundary map identifies the network area; only a connection assessment can address spare capacity. [S4]

Workplace Charging Scheme support runs until 31 March 2027: eligible purchase and installation costs receive up to 75%, capped at £500 per socket and 40 sockets across an applicant’s sites. Check eligibility and obtain a voucher before work proceeds. [S5] Ask your accountant about qualifying chargepoint allowances. [S6]

Set public access hours deliberately and identify public charging responsibilities under the regulations with your solicitor. [S7] Ask the council about planning constraints and check accessible bay routes. Before committing, have the proposed agreement address lost parking, lease length, insurance, liability, business rates, exit and reinstatement. A larger revenue share can be outweighed by costs left with your business.

Next step for your Stockton-on-Tees site

Gather supply details, a marked parking plan and evidence of likely use, then get matched with an installer that covers your area.

We refer enquiries to installer partners through a service operated by Piggy Pineapple Ltd and may earn a referral fee. Our owner holds shares in at least one partner. Before your details are passed on, we name the proposed partner and state whether that shareholding applies. See how we work.

How many plug-in vehicles share each public charger here?

Stockton-on-Tees has 16.1 privately kept plug-in vehicles for every public charger, ranked 200 of 357 UK councils (1 = most vehicles per charger). The UK figure is 13.1; the middle council has 17.8.

That is fewer than most councils: the public network here is already relatively dense, so a new site needs a clear reason drivers will stop, such as dwell time or a customer offer.

Vehicles are counted where the keeper lives, and drivers with a driveway often charge at home. Use this as a first screen, not a forecast. Chargers as at 1 July 2026; vehicles as at 2026 Q2.

See every council ranked, or check your own site by postcode.

Common questions

What information makes installer quotes comparable?

Specify the same bay layout, power requirement and access arrangements. Ask for separate equipment, shared infrastructure, groundworks, connection and commissioning lines, plus ongoing charges. [S9]

Which ongoing costs could reduce charging income?

Budget for software, servicing, payment handling and electricity, then check capacity and standing charges. The worked example assumes £900 annually for software and maintenance; it is not a published tariff. [S9]

How much extra could a supply upgrade cost?

The commercial reference puts a main supply upgrade at £40,000–£150,000 when required. That is outside this AC example's modest connection allowance; replace the illustration with a surveyed project budget. [S8]

What does HMRC say about chargepoint tax relief?

Its policy paper extends the 100% first-year allowance for qualifying chargepoints to 31 March 2027 for Corporation Tax and 5 April 2027 for Income Tax. Check eligibility and the applicable tax treatment with your accountant. [S6]

How should you allow for installation delays?

Put the supply assessment and permissions before a committed installation programme. Request milestones for design, civil works and commissioning, with connection-dependent dates identified explicitly. [S9]

Do publicly accessible business chargers need a helpline?

Yes. The public charging regulations require a staffed telephone helpline available at all times. Agree who operates that service before opening the chargers and review the contract with your solicitor. [S7]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Public EV chargers by local authority, EVCI0102, Department for Transport,Last checked 17 October 2026
  2. Licensed plug-in vehicles by local authority, VEH0142, Department for Transport,Last checked 17 October 2026
  3. Environmental Sustainability and Carbon Reduction Strategy 2022 to 2032, Stockton-on-Tees Borough Council,Last checked 17 October 2026
  4. All DNO Licence Area Boundaries map, Northern Powergrid,Last checked 17 October 2026
  5. Workplace Charging Scheme guidance for installers, Office for Zero Emission Vehicles,Last checked 17 October 2026
  6. Capital allowances extension for electric vehicle chargepoints, HM Revenue and Customs,Last checked 17 October 2026
  7. Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
  8. Workplace and rapid charger installation cost ranges, Commercial installation cost reference,Last checked 17 October 2026
  9. Commercial installation costs and project questions, Commercial installation cost reference,Last checked 17 October 2026
  10. Electric vehicle charging at Teesside Park, Teesside Park,Last checked 17 October 2026