EV charging for visitor attractions and leisure: is it worth it?
Visitor attractions and leisure sites should size charging around time on site and seasonal opening, then compare fully funded income with part funded and self funded payback. DfT classified 52% of public chargers as destination charging in July [S1]. That describes the network, not demand at your attraction. Use your own parking records and the assumptions below. Checked October 2026.
Are EV chargers worthwhile at a seasonal visitor attraction?
Begin with the visit, rather than the size of the car park. Someone spending the day at your attraction needs a different service from someone making a short leisure-centre visit. DfT classified 52% of public EV chargers as destination chargers on 1 July 2026 [S1]. That shows a recognised use, not a forecast for your site.
Use monthly parking records, opening days and charging enquiries to estimate sessions. Separate peak holiday arrivals from quieter weekdays. A large summer car park does not establish annual charging use. Keep any extra admission, café or shop margin outside the charging calculation until you can measure it.
Compare car park charging and the business case for installing chargers with your records.
What charging speed suits a day visit or leisure session?
A kilowatt (kW) measures power. A kilowatt hour (kWh) measures energy. As an illustration, a steady 7 kW over 4 hours supplies 28 kWh before losses: multiply power by time. Actual delivery depends on the vehicle and available power. Ask the designer to model those limits, rather than sizing only by charger labels.
Use these business types as separate survey briefs:
- Visitor attraction: plan for arrival waves and cars staying while families are inside; avoid compulsory moves.
- Gym and leisure centre: compare class-length visits with longer pool, café and staff stays.
- Golf club: separate golfers’ parking from clubhouse events and operational vehicles.
- Marina: distinguish day visitors and longer stays; vehicle charging needs its own assessment beside shore power.
- Sports club: test fixture-day demand separately from training evenings and quiet days.
Compare alternating current (AC) destination charging with direct current (DC) rapid charging only where short visits and measured demand support it. Read dwell time and choosing charger speed. Do not require visitors to interrupt an activity simply because the charging session finishes before their visit does.
Which fits seasonal demand: fully funded, part funded or self funded?
Ask every bidder to use the same monthly forecast. These are proposed structures, not standard contract terms.
| Model | Your commitment | Your return and risk |
|---|---|---|
| fully funded | Bays; provider buys, installs and owns | Share; provider operates and maintains |
| part funded | Shared capital; agree ownership | Larger share; define deductions |
| self funded | Full capital and operation; you own | Net income and low-use risk |
For fully funded, request annual host income under quiet-season conditions and any rent offer separately. For part funded, ask whether the share is of sales or surplus and how equipment replacement changes it. For self funded, identify who will run payments, answer drivers and repair faults.
Agree winter shutdowns, opening hours, exclusive rights, contract length, break rights and reinstatement. Ask your solicitor to check the term against your lease or operating concession, and cover redevelopment and operator failure. Read fully funded charging explained.
What could leisure chargers earn, and when would they pay back?
This is an illustration, not a quote. All commercial inputs are assumptions, not measured attraction data or published equipment prices. It tests destination charging with seasonal opening, not a rapid charging hub.
| Assumed input | Value |
|---|---|
| Equipment | 4 sockets, each rated 7 kW AC |
| Low / mid / high sessions | 2 / 4 / 8 per open day across the site |
| Opening | 240 days a year; no charging sales on closed days |
| Energy per session | 30 kWh sold; 33 kWh bought, allowing losses |
| Driver price | £0.60/kWh including VAT; £0.50 excluding VAT |
| Energy purchase cost | £0.25/kWh excluding recoverable VAT |
| Annual service budget | £1,800 software, maintenance, payments and insurance |
| Capital budget | £18,000–£30,000; no major grid upgrade |
| fully funded share | 10% of sales excluding VAT; provider pays operating costs |
| part funded share | 50% of operating surplus; host capital £9,000–£15,000 |
| self funded share | 100% of operating surplus; host pays full capital |
HMRC’s current public-charging position uses standard-rate VAT [S7], which is 20% [S8]. This example assumes VAT registration and full input recovery; check with your accountant. Do not apply that assumption automatically to a charity with mixed activities.
Annual sales = sessions × 240 × 30 × £0.50. Surplus = sessions × 240 × ((30 × £0.50) − (33 × £0.25)) − £1,800. Apply the agreed share to sales or surplus as stated above.
| Annual host result | Low use | Mid use | High use |
|---|---|---|---|
| fully funded income | £720 | £1,440 | £2,880 |
| part funded net income | £720 | £2,340 | £5,580 |
| part funded simple ROI | 4.8–8.0% | 15.6–26.0% | 37.2–62.0% |
| part funded payback, years | 12.5–20.8 | 3.8–6.4 | 1.6–2.7 |
| self funded net income | £1,440 | £4,680 | £11,160 |
| self funded simple ROI | 4.8–8.0% | 15.6–26.0% | 37.2–62.0% |
| self funded payback, years | 12.5–20.8 | 3.8–6.4 | 1.6–2.7 |
Simple return on investment (ROI) = yearly host net income ÷ host capital × 100. Payback = host capital ÷ yearly host net income. Equal ROI follows from assuming half the investment buys half the surplus.
The ranges exclude tax, finance, depreciation, rent, rates, major replacement, grants and visitor spending. They assume the service budget includes payment fees. Replace it with actual fixed and variable charges. Low-use payback may exceed equipment life; this calculation does not establish that the equipment lasts that long. With no charging sales, self funded still loses the service budget and has no positive payback.
What does your attraction’s car park need before installation?
Ask your distribution network operator (DNO), the company running the local electricity network, about the connection process [S4]. Supply an electrical survey covering kitchens, pool plant, lighting and other loads. Compare dynamic load management with an upgrade. A large parking area is not evidence of spare electrical capacity.
Map cable routes, flood exposure, coach access, emergency routes and accessible paths. Review controls, reach, lighting and signage with users who have different access needs. Keep chargers reachable when seasonal barriers and event layouts change, and price the full trench route rather than only the distance to the nearest building.
England widened permitted development for chargepoints [S9]. That is not site-specific permission: ask the planning authority about your installation and any heritage restrictions. Check the relevant national rules for sites elsewhere in the UK and obtain your landlord’s consent where needed. Check legal terms with your solicitor.
A customer restriction does not by itself make charging private [S6]. Identify who controls operation and ask for a written public-charging compliance plan [S2]. Specify seasonal access, payment arrangements, usage reports, repair response, insurance, damage and replacement responsibility before signing.
Grants and tax
The Workplace Charging Scheme distinguishes ordinary business customer parking from visitor parking at eligible charities and public authorities [S3]. Check your organisation’s status before treating a leisure car park as eligible. Qualifying chargepoint expenditure can receive the first-year capital allowance [S5]. Check with your accountant; neither benefit is included in the illustrated returns.
Next steps
Prepare monthly attendance and parking records, opening hours, tenure, an electricity bill and a site plan. Compare ROI and payback using annual demand, then get matched with an installer that covers your area.
Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing your details, we name the proposed partner and disclose any shareholding our owner holds in it. See how we work.
Common questions
Can an attraction close its chargers during winter?
Public charging can have restricted opening hours [S6]. Put seasonal access in the contract and publish accurate hours. Recalculate annual sales using open days, while retaining any year-round service fees.
Can a charity attraction or council leisure centre get a charging grant?
Eligible charities and public authorities may use Workplace Charging Scheme bays for visitors. Support is up to £500 per socket, capped at 75% of purchase and installation costs and 40 sockets across sites. Funding runs until 31 March 2027 [S3].
Can a commercial golf club claim a grant for members' chargers?
Ordinary businesses need staff or fleet parking for the Workplace Charging Scheme; customer use does not qualify. Charity or public-authority status changes the access rules, so check the applicant's actual status before counting a grant [S3].
Can parking admission include the charging fee?
A combined price is possible, but the electricity portion must be shown separately in pence per kilowatt hour. State parking and charging terms together so visitors can see both costs [S2].
Who answers charging faults when reception is shut?
In-scope public operators must provide a free staffed telephone helpline at all times. The Regulations exempt micro-business operators from this duty, while retaining pricing requirements. Identify the responsible operator and check the scope with your solicitor [S2].
Does buying chargers qualify for tax relief?
Qualifying chargepoint expenditure has a 100% first-year allowance until 31 March 2027 for Corporation Tax and 5 April 2027 for Income Tax [S5]. A deduction is not cash reimbursement. Check with your accountant; the illustration below includes no tax benefit.
Ask about your site
Sources
- Public electric vehicle charging infrastructure statistics: 1 July 2026, Department for Transport,Last checked 16 October 2026
- The Public Charge Point Regulations 2023, UK legislation,Last checked 16 October 2026
- Workplace Charging Scheme, Office for Zero Emission Vehicles,Last checked 16 October 2026
- Connecting electric vehicle chargepoints to the electricity network, Department for Energy Security and Net Zero,Last checked 16 October 2026
- Budget 2025, HM Treasury,Last checked 16 October 2026
- Public Charge Point Regulations 2023 guidance, Office for Product Safety and Standards,Last checked 16 October 2026
- VAT liability of supplies of electricity from public electric vehicle charge points, HM Revenue and Customs,Last checked 16 October 2026
- Public EV charging VAT parliamentary answer, HM Treasury,Last checked 16 October 2026
- Planning changes for public and private chargepoints, Department for Transport,Last checked 16 October 2026