EV charging for pubs, restaurants and cafés: is it worth it?

Match pub, restaurant and café charging to the time customers actually park, then test low demand before committing bays. DfT reported 121,171 public EV chargers across the UK on 1 July 2026 [S1]; nearby competition matters more than the national total. Compare fully funded host income with part funded and self funded payback using charging margin, not assumed extra food sales. Checked October 2026.

Last checked 16 October 2026

Why install EV chargers at a pub, restaurant or café?

Charging gives drivers another facility to consider when planning a stop. To test your own venue, record requests, parking duration and how many bays remain free during meal service. DfT reported 121,171 public EV chargers on 1 July 2026. [S1] Survey nearby alternatives rather than treating that national figure as local demand.

A pub might serve diners, overnight guests and local residents at different times. A restaurant should protect table-booking parking at peak service. A café may have short visits or longer working customers. A drive-thru needs a separate parking proposition: a car passing through the queue does not create a charging session.

Keep charging sales separate from food and drink. If you later measure spending by charging customers, account for displaced trade and the costs of serving them before adding a contribution to the business case. Compare overnight hospitality charging and why businesses install chargers.

How fast should customers charge during a meal?

Use observed parking duration and the amount of energy a customer would buy. Kilowatts (kW) measure charging power; kilowatt-hours (kWh) measure energy. In an assumed illustration, 7 kW for 1.5 hours supplies 10.5 kWh before losses: 7 × 1.5 = 10.5. Actual delivery also depends on the car and shared power limits.

Alternating current (AC) charging can be assessed for longer stops. Direct current (DC) charging needs a separate capital and connection case for shorter visits. Ask for both only where your observed demand justifies comparing them. The dwell-time guide helps you prepare the brief.

Do not promise a full recharge during lunch. Publish the charger rating, payment route, parking conditions and access hours. Decide how to manage cars left after the customer leaves, without asking serving staff to supervise every charging session.

Which funding model fits a hospitality car park?

Compare the same bay layout and access conditions across proposals. A prominent roadside site and a village venue should not inherit the same utilisation forecast simply because both serve meals.

Model You contribute Ownership and operation Measure to compare
fully funded Bays and a site agreement Provider buys, owns and maintains Annual host share or rent
part funded Shared capital and bays Provider operates; title agreed Net income, ROI, payback
self funded Full project capital You own; management can be outsourced Net income, ROI, payback

Ask who sets tariffs, pays electricity and controls the bays when you host an event. Have your solicitor review contract length, exclusivity, liability, insurance, business-rates responsibility, exit payments and restoration. Retain the written removal plan. Read hosting for revenue share before comparing headline percentages.

What could venue chargers earn, and how many years until payback?

This is an illustration, not a quote. Every price, share and utilisation input is an assumption. Sessions are totals across the installation. The model makes no allowance for extra food sales or increased bookings.

Assumed input Value
Equipment Two 7 kW AC sockets
Low / mid / high use 1 / 3 / 6 sessions per trading day
Trading days / energy per session 350 / 10 kWh
Driver tariff / energy cost £0.55 / £0.25 per kWh, excluding VAT
Software and maintenance £600 yearly
Capital / host part contribution £8,000–£14,000 / £4,000–£7,000
fully funded host share 10% of sales; provider bears running costs
part funded / self funded share 60% / 100% of operating net

Assume billed and purchased energy are equal. Annual energy E = sessions × 10 × 350. Sales = E × £0.55. Self funded net = E × (£0.55 − £0.25) − £600. Part funded net = that net × 60%. Fully funded host income = sales × 10%, without electricity or maintenance charges passed back to the host.

Annual result Low use Mid use High use
Energy, kWh 3,500 10,500 21,000
fully funded host income £192.50 £577.50 £1,155
part funded net income £270 £1,530 £3,420
self funded net income £450 £2,550 £5,700
Return on host capital Low use Mid use High use
part funded simple ROI 3.9–6.8% 21.9–38.3% 48.9–85.5%
part funded payback, years 14.81–25.93 2.61–4.58 1.17–2.05
self funded simple ROI 3.2–5.6% 18.2–31.9% 40.7–71.3%
self funded payback, years 17.78–31.11 3.14–5.49 1.40–2.46

Simple return on investment (ROI) = annual net ÷ host capital × 100. Payback = capital ÷ annual net. Ranges use the capital endpoints. Long low-use paybacks may exceed equipment life. Negative net produces no simple payback; a funded proposal may be unavailable at low usage.

Grants, tax, finance, transaction fees, electrical losses, downtime, grid works and replacements are excluded. Add these and test lost parking contribution before deciding. See charging income calculations for the difference between sales and margin.

What power, parking and public charging rules need checking?

Your distribution network operator (DNO) manages local connections. UK Power Networks provides an installer route for charging equipment. [S5] Ask for a supply survey that includes kitchen peaks, then request a local planning assessment and landlord consent. Keep cables away from pedestrian routes, delivery areas and outdoor seating.

Public status can apply during restricted access hours. [S3] Public charging has consumer duties covering pricing, payment and support. [S4] Assign those tasks explicitly to the operator. Ask it to identify applicable exemptions and show the compliant payment journey before opening. Give parking charges and charging charges separate signs so customers can understand both.

Which grants and tax rules apply to your proposal?

WCS offers eligible installations up to £500 per socket, subject to the 75% limit and 40-socket cap, with funding to 31 March 2027. [S2] Check the user category before counting a grant against diner charging. HMRC confirms qualifying chargepoint expenditure has a 100% first-year allowance to 31 March 2027 for Corporation Tax. [S6] Check with your accountant; the allowance is not cash reimbursement of the full purchase price.

What should you do next?

Gather parking duration, electricity bills, service hours and a bay plan. Then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing details, we name the proposed partner and disclose whether our owner holds shares in it. Read how we work.

Common questions

Can WCS pay for chargers used only by diners?

Ordinary business eligibility concerns staff or fleet parking. Do not budget a grant for customer-only bays on that basis; assess any accommodation activity under its own eligibility category. [S2]

How should you display the price of public charging?

Display the maximum charging price in pence per kWh before a session starts, including connection or other charging fees. Show the parking price separately when charging and parking are bundled. [S4]

Does a new public charger need contactless payment?

The rules cover new public chargers rated 8 kW or above, subject to applicable exemptions. Confirm the proposed equipment, deployment and operator status before ordering. [S4]

Can customers charge while the pub is closed?

You can propose restricted access hours; a public charger can remain public within those hours. Make opening hours and gate arrangements clear and check the agreement with your solicitor. [S3]

Who should answer public charging faults?

Where the helpline duty applies, the operator must provide a free staffed telephone service available around the clock. Identify the responsible operator in the contract and display the contact. [S4]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Public EV charging infrastructure, 1 July 2026, Department for Transport,Last checked 16 October 2026
  2. Workplace Charging Scheme current eligibility, Department for Transport,Last checked 16 October 2026
  3. Public Charge Point Regulations guidance, Department for Transport,Last checked 16 October 2026
  4. Public Charge Point Regulations guidance deposited with legislation, Department for Transport,Last checked 16 October 2026
  5. EVs, solar, storage and heat pumps, UK Power Networks,Last checked 16 October 2026
  6. First-year allowances for electric charge points, HM Revenue and Customs,Last checked 16 October 2026
Check your site