Christchurch EV charging: can A35 stops repay a charger?

A Christchurch pub needs evidence that passing drivers can stop, rather than relying on road traffic alone. The supplied DfT extract records 29,712 vehicles a day on the A35 [S5]. Compare access and visitor dwell time with the local charging listings, then test the rapid-charger illustration including the separate supply-upgrade scenario. Checked October 2026.

Last checked 17 October 2026

Which A35 journeys might turn into a stop at your premises?

Christchurch’s busiest counted major road in the supplied DfT extract is the A35, with 29,712 vehicles a day in 2025 [S5]. A pub or café needs a safe, convenient stopping place before that traffic matters commercially. Check the actual turn into your site, onward route and whether queues would interfere with deliveries.

Town-centre visitors already have different parking options. The council identifies Saxon Square as short-stay parking and points longer stays towards locations including Christchurch Quay and Priory [S11]. Its separate Saxon Square facilities page lists accessible toilets and baby-changing provision [S12]. These are practical local amenities to compare with your offer, rather than evidence that all visitors will use a new charger.

Use the site checker to assess access before estimating sessions.

How much charging supply is listed in Christchurch?

The supplied town extract records 16 public sites listed on Open Charge Map, containing 38 devices; 8 sites include rapid charging [S1]. Its Census built-up-area population is 48,973 [S2] [S3]. The resulting ratios are 3.3 sites and 7.8 devices per 10,000 residents.

Open Charge Map is community-maintained and lists fewer points than DfT’s council count. Its live map could not be used to reproduce the supplied extract today. These figures describe that snapshot, rather than an official total or a live availability service. Compare access hours and nearby facilities before concluding there is a gap. The local charging tool can help you organise those checks.

Could a Christchurch pub recover the cost of rapid charging?

Consider a pub with off-street parking that wants to serve short customer visits as well as passing motorists. Fully funded places purchase and operation with a provider; your income is the agreed host share. Part funded requires a host contribution for a larger return. Self funded puts the investment and operating surplus with the pub. None establishes how many sessions you will sell.

Pub rapid-charger calculation

This is an illustration, not a quote. kW is kilowatts of power; kWh is kilowatt-hours of energy. DC means direct current. Session volumes, tariffs, shares and overheads are assumptions.

Input Assumed or reference value
Charger One 50 kW DC unit
Sessions per day, low / mid / high 1 / 3 / 6
Energy per session / operating days 20 kWh / 365
Driver price / electricity cost 65p / 25p per kWh, excluding VAT
Annual software, maintenance and payment costs £1,500
Installed equipment reference £15,000–£45,000, excluding grid connection [S6] [S7]
Capital used, suitable existing supply £30,000
Part funded host capital / surplus share £15,000 / 50%
Fully funded host capital / sales share £0 / 10%
Annual outcome Low Mid High
Energy sold, kWh 7,300 21,900 43,800
Fully funded host income £475 £1,424 £2,847
Self funded net income £1,420 £7,260 £16,020
Self funded ROI 4.7% 24.2% 53.4%
Self funded payback, years 21.1 4.1 1.9
Part funded net income £710 £3,630 £8,010
Part funded ROI 4.7% 24.2% 53.4%
Part funded payback, years 21.1 4.1 1.9

At middle use, 3 × 20 × 365 = 21,900 kWh. Sales = 21,900 × £0.65 = £14,235. Net = 21,900 × (£0.65 − £0.25) − £1,500 = £7,260. The fully funded provider pays operating costs and gives the host 10% of sales. The assumed part funded agreement splits the surplus equally. ROI is net ÷ your capital × 100; payback is your capital ÷ net. Rounded outputs use unrounded calculations.

A main supply upgrade is a separate £40,000–£150,000 cost reference [S6] [S7]. Add £40,000 as a sensitivity: total capital becomes £70,000, with self funded payback of 49.3 / 9.6 / 4.4 years and ROI of 2.0% / 10.4% / 22.9%. Splitting that total equally gives the part funded host the same returns on £35,000.

Groundworks and cabling outside the installation scope, connection fees and any further reinforcement remain extra. Exclude grants, tax, borrowing, rent, major replacements and business rates changes from these operating figures. Ask your distribution network operator, or DNO, for a connection assessment [S9]. Rerun the income calculation with its written price.

Which grant checks come before an order?

The Workplace Charging Scheme cap is £500 per eligible socket and the scheme runs until 31 March 2027 [S8]. Check whether your proposed use qualifies; a roadside customer charger is not automatically a workplace project. The illustration assumes no grant.

Ask the planning authority to review your layout and your solicitor to review landlord consent, liability, exit rights and reinstatement. Confirm who sets prices and supports drivers. Public-facing installations also need the public charging regulations addressed before commissioning [S10].

How does Christchurch sit within BCP and the South West?

Christchurch represents approximately 12% of the council population in the supplied comparison [S2] [S3]. The BCP council extract records 458 public chargers and 201 rapid chargers on 1 July 2026 [S4]. Do not compare the town’s rapid sites directly with the council’s rapid devices.

Use the BCP area overview and the South West page for wider context; your own customer counts decide the starting case.

Next steps

Prepare an access sketch, a record of likely stopping customers and your electricity details, then get matched with an installer that covers your area. Piggy Pineapple Ltd operates the site, refers enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. We name the proposed partner and disclose any owner shareholding before passing on details.

Common questions

How much does upgrading the electricity supply add?

The commercial cost references give a £40,000–£150,000 main supply upgrade range, separate from equipment. The sensitivity calculation here adds £40,000; only a connection assessment can price your site [S6] [S7] [S9].

Can drivers stay longer while charging at Saxon Square?

The council publishes a maximum stay of 4 hours at Saxon Square. Charging does not establish a right to overstay; check signs and any charging conditions when visiting [S11].

Must a new rapid charger offer contactless card payment?

A paid public 50 kW charger falls within the contactless requirement, subject to the statutory operator exemptions. Have the proposed operator confirm its compliance responsibilities in writing [S10].

Who pays for electricity under a revenue-share arrangement?

State this in the agreement. In this example the provider pays electricity and annual overhead under fully funded; the host receives 10% of sales after no further modelled deductions.

Does a busy road establish that chargers will repay their cost?

No. DfT counts measure vehicles passing a count point. Survey your own access and stopping customers; the supplied A35 daily count is not a count of likely charging sessions [S5].

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Community charging locations, Open Charge Map,Last checked 17 October 2026
  2. Census TS001 population, ONS via Nomis,Last checked 17 October 2026
  3. Built-up area Census data, ONS,Last checked 17 October 2026
  4. Public charging infrastructure tables, Department for Transport,Last checked 17 October 2026
  5. Road traffic counts, Department for Transport,Last checked 17 October 2026
  6. Commercial charger installation cost ranges, Installation cost guide,Last checked 17 October 2026
  7. Commercial installation cost reference, Commercial cost guide,Last checked 17 October 2026
  8. Workplace Charging Scheme installer guidance, OZEV,Last checked 17 October 2026
  9. Connecting chargepoints to the electricity network, GOV.UK,Last checked 17 October 2026
  10. Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
  11. Saxon Square car park, BCP Council,Last checked 17 October 2026
  12. Saxon Square public toilets, BCP Council,Last checked 17 October 2026