South Shields: can visitor stays support EV bays?

South Shields has 35 public charging sites listed in the supplied Open Charge Map snapshot [S3]. A destination business should therefore identify a particular visitor need rather than assume charging is absent. The seafront and town centre suggest different parking stays. Check those stays, existing alternatives and connection costs before comparing fully funded income with part funded or self funded returns. Checked October 2026.

Last checked 17 October 2026

Which A194 journeys and visitor stays could reach your site?

The A194 carries 34,564 vehicles a day in the supplied 2025 DfT snapshot, making it the busiest counted major road attached to South Shields [S4]. Check the route from that corridor to your entrance. A daily traffic count does not measure electric vehicles seeking a stop at your premises.

The council’s Local Plan main-modifications document identifies South Shields as the principal market town and supports its market and wider town-centre uses [S11]. Separately, its performance update identifies South Marine Park and North Marine Park in South Shields and reports on Sandhaven Beach [S12]. These are specific shopping and seafront contexts for a visitor-parking assessment.

At your café, attraction or car park, record how stays differ between quiet weekdays, events and peak visitor periods. Look at the walking route from the proposed bays and whether charging customers can still use your facilities. The visitor-attraction sector page helps you compare destination parking with short roadside stops.

How much public charging is already listed locally?

The supplied built-up-area dataset contains 35 public sites listed on Open Charge Map, with 73 devices and 8 rapid sites [S3]. South Shields has 73,326 Census residents in that boundary [S1], [S2]. Density works out at 4.8 sites and 10.0 devices per 10,000 residents: divide the count by residents, multiply by 10,000 and round.

Because Open Charge Map is community-maintained and lists fewer points than the DfT council count, its town snapshot must not be read as an official total. Review opening hours, bay restrictions and reliability at the locations your customers would otherwise use. The local charging map can organise that check, but a map entry alone does not confirm a working socket.

What could a destination car park earn from slower charging?

Consider a hypothetical visitor attraction offering six 7 kW alternating-current (AC) sockets. Kilowatts (kW) measure charging power and kilowatt-hours (kWh) measure energy delivered. This is an illustration, not a quote. All commercial inputs below are assumptions except the cited installation bands.

Input Amount or assumption
Sessions a day across six sockets, low / mid / high 2 / 6 / 10
Energy supplied per session 12 kWh
Driver tariff / purchased electricity £0.50 / £0.25 per kWh
Software and maintenance per year £1,200
Six sockets at £1,200–£2,000 each £7,200–£12,000 [S6]
Shared infrastructure £3,000–£8,000 [S6]
Extra groundworks, cables and connection allowance £5,000 assumed
Capital range / central illustration £15,200–£25,000 / £20,000
Host shares fully funded 10% sales; part funded 60% net

The multi-socket band applies to a workplace installation comparator. Public payment, support and access requirements need their own specification. The allowance assumes no major supply upgrade. Ask for an itemised scope separating shared infrastructure from extra civil and cable works [S7], [S10].

Yearly energy = sessions × 12 × 365. Turnover = energy × £0.50. Operating net = energy × (£0.50 − £0.25) − £1,200.

Yearly host outcome Low Mid High
fully funded income £438 £1,314 £2,190
part funded net income £594 £3,222 £5,850
part funded ROI / payback years 5.9% / 16.8 32.2% / 3.1 58.5% / 1.7
self funded net income £990 £5,370 £9,750
self funded ROI / payback years 5.0% / 20.2 26.9% / 3.7 48.8% / 2.1

Fully funded assumes the provider finances, installs, owns and operates the sockets, with the host providing space. Part funded requires £10,000 host capital for the assumed larger share; self funded requires £20,000 and retains the full operating net. These are model terms, not evidence that a provider will fund your project.

Simple return on investment (ROI) = annual host net ÷ host capital × 100. Payback in years = host capital ÷ annual net. In the central self funded case, £20,000 ÷ £5,370 = 3.7 years. No host capital payback applies to the fully funded assumption.

The calculation omits VAT effects, tax, grants, financing, card fees, losses, replacement and displaced parking receipts. Model the actual seasonal calendar in the income and payback tool. Extra café spending is excluded because no measured link to charging has been established.

Which grants, permissions and operating duties apply?

WCS runs until 31 March 2027 and offers eligible installations up to £500 per socket, capped at 75% of cost and 40 sockets per applicant [S8]. Ordinary public visitor bays should not be treated as eligible workplace bays. Check any staff/fleet element separately. HMRC’s qualifying chargepoint first-year allowance is 100%; check with your accountant before relying on tax relief [S9].

Get the distribution network operator (DNO), your local electricity network manager, to assess the available supply. Seek a planning review and keep accessible routes clear. The public charging regulations set requirements for driver pricing, payment and support [S10]. Ask your solicitor to examine liability, insurance, business rates, contract length, site redevelopment and exit arrangements.

How does South Shields compare with its borough?

The town represents approximately 48% of the council area’s population in the supplied Census comparison [S1], [S2]. South Tyneside’s council page has 265 public chargers, including 17 rapid devices, in the supplied July 2026 DfT figures [S5]. The town’s directory sites and council devices are different units and coverage; they do not yield a reliable share of provision. Use the North East regional page for the wider comparison.

What should you do before choosing a proposal?

Bring a bay plan, visitor-stay records and your supply details, then get matched with an installer that covers your area.

We refer enquiries to installer partners and may be paid a fee. Piggy Pineapple Ltd operates the service, and our owner holds shares in at least one partner. Before details are passed on, we identify the receiving partner and explain any shareholding the owner has in it.

Common questions

What is the published cost approach for a group of workplace chargers?

For 5–10 sockets, the published 7 kW band is £1,200–£2,000 each plus £3,000–£8,000 shared infrastructure. Groundworks, cables, connection and any public-facing specification still need explicit scope checks. [S6], [S7]

Must I use the same tariff for guests and other drivers?

Agree tariff control with the operator and require clear prices for each access group. Public charging prices must be displayed in pence per kWh; discounts do not remove that duty. [S10]

Can charging continue after my café closes?

It can be designed that way, but public driver support must remain available around the clock. Check bay access, lighting and payment availability against the advertised charging hours. [S10]

Are town-centre plans proof that my chargers will be busy?

No. The council's plan document identifies the market and town-centre visitor uses, not charging demand at your address. Count parking stays and test low use before allocating capital. [S11]

How should a paid public site explain parking and charging prices?

Display the energy price clearly in pence per kWh and make separate parking or access conditions visible. Have the operator demonstrate the payment journey before opening the bays. [S10]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Census 2021 usual residents, TS001, ONS via Nomis,Last checked 17 October 2026
  2. Built-up area boundaries and output-area geography, Office for National Statistics,Last checked 17 October 2026
  3. Community public charging registry, Open Charge Map contributors,Last checked 17 October 2026
  4. Road traffic counts, Department for Transport,Last checked 17 October 2026
  5. Public charging infrastructure data tables, July 2026, Department for Transport,Last checked 17 October 2026
  6. Commercial installation cost bands, Commercial installation cost guide,Last checked 17 October 2026
  7. Commercial installation cost components, Commercial charging cost guide,Last checked 17 October 2026
  8. Workplace Charging Scheme installer guidance, Office for Zero Emission Vehicles,Last checked 17 October 2026
  9. Chargepoint first-year capital allowances extension, HMRC,Last checked 17 October 2026
  10. Public Charge Point Regulations 2023 guidance, Department for Transport via legislation.gov.uk,Last checked 17 October 2026
  11. Local Plan main modifications, town centres and market, South Tyneside Council,Last checked 17 October 2026
  12. Council performance update, parks and Sandhaven, South Tyneside Council,Last checked 17 October 2026
Check your site