Jarrow: does one listed rapid site leave room?

Jarrow has 1 rapid site in the supplied Open Charge Map town snapshot [S3]. A business might add useful short-stop capacity, but this directory count is incomplete and cannot establish demand or available grid power. Check existing access and customer stays, then compare funded host income against the full capital cost, including connection work, before buying equipment. Checked October 2026.

Last checked 17 October 2026

Does Jarrow need another rapid site or different access?

Only 1 rapid site appears among Jarrow’s 16 public charging sites listed on Open Charge Map in the supplied snapshot. Those locations contain 31 devices [S3]. With 29,467 Census residents, the built-up area has 5.4 listed sites and 10.5 devices per 10,000 people [S1], [S2]. Density is count ÷ population × 10,000, rounded.

The possible gap is rapid access, not necessarily a shortage of every charger type. Open Charge Map is community-maintained, with fewer listed points than DfT’s council count, rather than an official town total. Inspect unlisted alternatives, opening restrictions and actual availability through the local charging tool before proposing additional bays.

A host might offer a useful alternative if customers already make short visits and can reach the charger easily. Equally, longer-stay workers may need slower equipment. The directory alone cannot decide between them.

Which A19 journeys and local visitors might stop?

The supplied 2025 DfT snapshot identifies the A19 as Jarrow’s busiest counted major road, at 61,152 vehicles a day [S4]. Do not turn that count into a sales percentage without evidence of access and stopping behaviour.

Jarrow Hall advertises corporate-event spaces close to the A19 [S11]. The council’s Economic Recovery Plan also references an expansion of Jarrow Business Centre when discussing business accommodation [S12]. These establish local event and workplace contexts; neither supplies charger utilisation.

For your premises, ask whether drivers need a quick top-up or are already staying through a meeting. Check the return route to the road, signage visibility and whether deliveries cross the proposed cable or bay area. Workplace examples help distinguish recurring staff demand from public visits.

Who could benefit, and can rapid charging repay its full cost?

A hypothetical business-centre café with public parking can test a 50 kW direct-current (DC) unit. Kilowatts (kW) measure power, while kilowatt-hours (kWh) measure energy. This is an illustration, not a quote; the café, usage and commercial terms are invented assumptions for calculation, not a local case study.

Input Budget or assumption
Sessions daily, low / mid / high 1 / 3 / 8
Energy per session 30 kWh
Driver price / electricity cost £0.65 / £0.25 per kWh
Yearly software and maintenance £2,000
Installed 50 kW unit, excluding grid £15,000–£45,000 provisional band
Separate supply upgrade £40,000 assumed [S6]
Extra site works and cable allowance £5,000 assumed
Capital range / central budget £60,000–£90,000 / £75,000
Host revenue assumptions fully funded 10% of sales; part funded 60% of operating net

The opened article supports £25,000–£45,000 for the installed unit; the provisional £15,000 lower bound is an assumption. It also gives £40,000–£150,000 for a main supply upgrade [S6]. A higher connection offer changes the capital band materially. Require a scope breakdown to avoid counting included installation work twice [S7].

Energy each year = sessions × 30 × 365; sales = energy × £0.65. Operating net = energy × (£0.65 − £0.25) − £2,000.

Host annual result Low Mid High
fully funded income £711.75 £2,135.25 £5,694
part funded net income £1,428 £6,684 £19,824
part funded ROI / payback years 3.8% / 26.3 17.8% / 5.6 52.9% / 1.9
self funded net income £2,380 £11,140 £33,040
self funded ROI / payback years 3.2% / 31.5 14.9% / 6.7 44.1% / 2.3

Fully funded assigns payment, installation, ownership and operation to the provider; the host supplies land access. Part funded assumes £37,500 from the host for the stated net share. Self funded uses £75,000 host capital and retains operating net. The assumed shares are not offers.

Simple return on investment (ROI) = yearly host net ÷ host capital × 100. Payback years = capital ÷ yearly net. At high use, equipment-only £30,000 capital would suggest 110.1% ROI and 0.9 years. Including the £40,000 upgrade and £5,000 extra works gives 44.1% and 2.3 years. Fully funded has no host capital to repay here.

The model excludes tax, VAT effects, grants, borrowing, losses, transaction fees, equipment replacement and parking income displaced. Test seasonal closures and a higher connection cost using the income calculator.

What grants and public charging duties need checking?

WCS provides up to £500 per eligible socket, within a 75% cost cap and 40-socket limit, until 31 March 2027 [S8]. It should not be deducted automatically from a public café rapid proposal. Qualifying chargepoint expenditure may receive a 100% first-year allowance; check with your accountant [S9].

Ask your distribution network operator (DNO), the company managing the local electricity network, for a connection assessment. Obtain a planning view and protect accessible pedestrian routes. Identify the operator responsible for public pricing, payments and driver support under the charging regulations [S10]. Your solicitor should review liability, business rates, the term, redevelopment breaks and exit costs.

How does Jarrow compare with South Tyneside?

Jarrow accounts for approximately 19% of its council population in the supplied Census comparison [S1], [S2]. South Tyneside has 265 public chargers, including 17 rapid devices, in the July 2026 DfT dataset [S5]. A town’s directory rapid sites cannot be divided by council rapid devices to measure coverage. Compare the North East context before making a site decision.

What should your next enquiry include?

Describe the available bays, visitor stays and supply, then get matched with an installer that covers your area.

This referral service belongs to Piggy Pineapple Ltd. Installer partners may pay us a fee for enquiries we refer. Our owner holds shares in at least one partner; before sharing details, we name the proposed recipient and state whether our owner holds shares in it.

Common questions

Must a new paid public rapid charger take contactless payments?

Yes. New paid public points of 8 kW and above, and existing points of 50 kW and above, are covered by the contactless requirement. Include the payment equipment and ongoing charges in the specification. [S10]

How much extra might a major supply upgrade cost?

The published indicative range is £40,000–£150,000 when the main site supply is inadequate. This is separate from the installed rapid unit; only a connection assessment establishes your actual requirement. [S6], [S7]

Can nearby event activity establish charging utilisation?

No. Jarrow Hall confirms corporate event facilities close to the A19, but provides no charging-session forecast for your premises. Obtain visitor stay and arrival records before choosing capacity. [S11]

How can a host check that its revenue share is paid correctly?

Ask for delivered kWh, the pence-per-kWh tariff and an itemised settlement showing every deduction. Public charging already requires clear energy-based pricing; reconcile the contract share against those records. [S10]

What should be settled about a funded agreement's end date?

Identify equipment ownership, continued operation, removal and reinstatement in writing. The regulations distinguish operating responsibilities from ownership; have your solicitor check how each transfers at exit. [S10]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Census 2021 usual residents, TS001, ONS via Nomis,Last checked 17 October 2026
  2. Built-up area boundaries and output-area geography, Office for National Statistics,Last checked 17 October 2026
  3. Community public charging registry, Open Charge Map contributors,Last checked 17 October 2026
  4. Road traffic counts, Department for Transport,Last checked 17 October 2026
  5. Public charging infrastructure data tables, July 2026, Department for Transport,Last checked 17 October 2026
  6. Commercial installation cost bands, Commercial installation cost guide,Last checked 17 October 2026
  7. Commercial installation cost components, Commercial charging cost guide,Last checked 17 October 2026
  8. Workplace Charging Scheme installer guidance, Office for Zero Emission Vehicles,Last checked 17 October 2026
  9. Chargepoint first-year capital allowances extension, HMRC,Last checked 17 October 2026
  10. Public Charge Point Regulations 2023 guidance, Department for Transport via legislation.gov.uk,Last checked 17 October 2026
  11. Jarrow Hall corporate events and access, Jarrow Hall,Last checked 17 October 2026
  12. Economic Recovery Plan and Jarrow Business Centre, South Tyneside Council,Last checked 17 October 2026
Check your site