Consett: could meal-time charging fill a local gap?

Consett has 1 rapid site in the supplied Open Charge Map snapshot [S3]. Your pub or shop could investigate convenient destination charging, but a listing gap alone cannot predict paying sessions. Compare visitor stays, parking access and supply costs before choosing a funding model or committing your bays. Checked October 2026.

Last checked 17 October 2026

Where could a Consett host fill a charging gap?

Consett’s snapshot contains 7 public charging sites listed on Open Charge Map, with 13 devices and 1 rapid site [S3]. Set against 29,874 residents in the Census 2021 built-up area, that is 2.3 sites and 4.4 devices per 10,000 residents [S1], [S2]. A business could investigate access outside shopping hours or charging during a meal, rather than assume the whole settlement lacks provision.

The calculation is listed sites or devices ÷ population × 10,000. Open Charge Map is community-maintained and lists fewer points than DfT’s council count. Its town listings are not the official total, and an apparently small rapid count does not establish queues or a viable new rapid location.

Map opening restrictions as well as equipment in the local charging tool. Your useful gap might be reliable access during dinner, rather than a higher power rating.

Do road traffic and visitor stops support charging?

The busiest counted major road in the supplied Consett snapshot is the A691, averaging 11,633 vehicles a day in 2025 [S5]. Those vehicles are not all customers, electric cars or journeys through your entrance. Check the turn into your car park and whether drivers can find it after dark.

The Empire Theatre is in Consett town centre, with Albert Road parking identified in its visitor directions [S11]. Visit County Durham also lists Consett Market on Middle Street [S12]. These give you distinct reasons to investigate evening and shopping visits. Neither source measures charger demand. A pub should count how long diners park; a shop should separate brief errands from customers who stay through a charging session.

Which hosts benefit, and what might a pub earn?

A hypothetical town-centre pub can compare paid destination charging with the value of keeping ordinary parking available. A kilowatt (kW) is power; a kilowatt-hour (kWh) is energy. The following is an illustration, not a quote, for one 7 kW alternating-current (AC) charger.

Input Illustrative basis
Whole-site sessions daily, low / mid / high 0.5 / 1 / 2
Energy delivered per session 12 kWh
Driver tariff / electricity purchase price £0.50 / £0.25 per kWh
Annual software and maintenance £300
Installed charger band £1,400–£2,500 [S6]
Provisional extra works £1,000
Total range / capital used in calculations £2,400–£3,500 / £3,000
Host revenue assumptions 10% of sales fully funded; 60% of net part funded

Groundworks, cable runs and connection remain extra to the charger band. The extra works figure is an allowance, not a surveyed price. Infrastructure must be itemised [S7]. Usage, tariffs, operating costs and revenue shares are assumptions; grants are excluded.

Energy a year = daily sessions × 12 × 365; sales = energy × £0.50. Net a year = energy × £0.25 − £300.

Result for the host Low Mid High
Annual energy, kWh 2,190 4,380 8,760
fully funded annual income £110 £219 £438
part funded annual net £149 £477 £1,134
part funded ROI / years to pay back 9.9% / 10.1 31.8% / 3.1 75.6% / 1.3
self funded annual net £248 £795 £1,890
self funded ROI / years to pay back 8.3% / 12.1 26.5% / 3.8 63.0% / 1.6

With fully funded, the provider funds, installs, owns and operates the equipment; the host supplies bays and takes 10% of sales here. With part funded, assume £1,500 host capital and 60% of operating net. With self funded, assume £3,000 capital and all operating net. Simple return on investment (ROI) divides annual host net by host capital, multiplied by 100; payback divides that capital by annual host net. Rounding explains small differences if you recalculate from displayed pounds.

These pre-tax outcomes exclude finance, VAT effects, equipment replacement and displaced parking income. Try different meal-time use in the payback calculator. For a weak-use result, do not count additional drink or food sales without separate evidence.

What grants and obligations apply to a Consett pub?

WCS offers eligible installations up to £500 per socket and runs until 31 March 2027 [S8]. Establish staff or fleet eligibility before relying on it. Customer access alone does not establish entitlement.

First-year allowances concern qualifying capital expenditure, not host revenue; check with your accountant [S9]. Public charging has duties under the Public Charge Point Regulations 2023 [S10]. Ask the council about the actual planning layout and discuss land rights with your solicitor.

Before accepting an offer, write down who handles faults, insurance and driver support. Have the lease reviewed for term length, bay restrictions, rates, exit rights and reinstatement liability. A funded proposal needs the same scrutiny as an equipment purchase.

How does Consett fit into the County Durham network?

County Durham had 802 public chargers, including 204 rapid, on 1 July 2026 [S4]. Consett’s supplied population share is about 6%; its community site count cannot be compared directly with that official device total. Consult the North East overview for the wider setting and sector guidance for a business model that matches your premises.

What should you do next?

Compare the pub and café options before reserving meal-time parking bays.

Prepare a parking survey and electricity bill, then get matched with an installer that covers your area.

This site is operated by Piggy Pineapple Ltd. We refer enquiries to installer partners and may receive a fee. Our owner holds shares in at least one partner; before sharing details, we identify the proposed partner and disclose any shareholding our owner holds in that company.

Common questions

Should a pub choose AC or rapid equipment?

Compare actual stay length with the installation bands. A single 7 kW workplace charger is listed at £1,400–£2,500, before extra site works; rapid equipment needs a separate design. [S6]

Is parking near the theatre relevant to my site?

The Empire identifies Albert Road parking as a nearby option. Compare your opening hours and walking route with that existing visitor choice before assuming theatre custom. [S11]

What is the grant limit across a business?

WCS is capped at 40 sockets across an applicant's sites. Eligibility depends on use and applicant conditions; a public visitor-only scheme is not automatically eligible. [S8]

Can an annual traffic average predict charging sessions?

No. DfT road counts describe traffic on a road link. Survey arrivals at your entrance and keep charging conversion as a separate assumption. [S5]

What public payment duties must I budget for?

Public charging regulations impose payment and price-display requirements. Ask for an itemised compliance plan and have your solicitor check responsibility under the contract. [S10]

Can a tax allowance remove my whole bill?

An allowance concerns qualifying expenditure and taxable profits, rather than reimbursing your purchase price. Check with your accountant and keep tax outside a pre-tax illustration. [S9]

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Census 2021 population table TS001, ONS via Nomis,Last checked 17 October 2026
  2. Census 2021 built-up area characteristics, Office for National Statistics,Last checked 17 October 2026
  3. Community charging location registry, Open Charge Map,Last checked 17 October 2026
  4. Public chargers by local authority, July 2026, Department for Transport,Last checked 17 October 2026
  5. Road traffic counts, Department for Transport,Last checked 17 October 2026
  6. EV charger installation cost UK 2026, Industry cost guide,Last checked 17 October 2026
  7. Commercial EV charger installation cost, Industry cost guide,Last checked 17 October 2026
  8. Workplace Charging Scheme installer guidance, Office for Zero Emission Vehicles,Last checked 17 October 2026
  9. Capital allowances extension for chargepoints, HMRC,Last checked 17 October 2026
  10. Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
  11. Empire Consett visitor travel and parking, Empire Consett,Last checked 17 October 2026
  12. Consett Market visitor listing, Visit County Durham,Last checked 17 October 2026
Check your site