Is there a charging gap your Dunstable business could serve?
Dunstable's supplied snapshot has 8 public charging sites listed on Open Charge Map [S1]. A host should check which nearby chargers match its visitors' stay, rather than assuming the listing proves unmet demand. A guesthouse example below shows the difference between annual revenue-share income and paying back your own installation. Checked October 2026.
What is missing from Dunstable’s listed charging provision?
The built-up-area snapshot contains 8 public sites with 17 devices and 2 rapid sites listed on Open Charge Map [S1]. The Census-derived population is 34,498 residents, using output areas aggregated to the ONS settlement boundary [S2], [S3]. This corresponds to 2.3 listed sites and 4.9 devices per 10,000 residents.
The calculation is count ÷ 34,498 × 10,000. Open Charge Map is community-maintained and lists fewer points than DfT’s council series. These figures describe its listings within a boundary, not the official total of charging available to Dunstable drivers.
Your potential addition should solve a specific problem: overnight access for guests, a reliable workplace bay or charging during a longer visit. Map the alternatives in the local charging tool and check their access conditions before assuming a shortage.
How do A5183 traffic and town-centre visits shape the opportunity?
The busiest major-road link matched in the supplied dataset is the A5183, averaging 15,974 vehicles daily in the 2025 DfT extract [S4]. Its daily flow does not tell you how many drivers will turn into your car park. Assess entry, exit, visibility and customer stops at your own frontage.
Priory Gardens forms part of a scheduled monument. The town council identifies nearby pay-and-display parking on Church Street and Ashton Square [S11]. A guesthouse can explain these visitor options without suggesting it controls that public parking. For proposed works near heritage assets, take the location plan to the planning team before specifying equipment.
Grove House Gardens provides a town-centre setting for community events and performances [S12]. That is a distinct reason to examine evening and event-day parking use. It does not establish year-round charging demand or extra visitor spending, so keep those possible benefits out of the income arithmetic.
Which Dunstable businesses could benefit, and what could they earn?
For a guesthouse, charging may fit an existing overnight stay. Check the bed-and-breakfast guide for the operating questions. A kilowatt (kW) measures power; a kilowatt hour (kWh) measures energy supplied. AC means alternating current.
Here is an illustration, not a quote for a guesthouse with its own suitable parking.
| Assumption | Value |
|---|---|
| Charger | One 7 kW AC unit |
| Sessions per day, low / mid / high | 0.5 / 1 / 1.5 |
| Energy per session | 16 kWh |
| Guest tariff / electricity input | £0.50 / £0.25 per kWh |
| Software, maintenance and billing allowance | £350 annually |
| Installed workplace unit cost reference | £1,400–£2,500 [S7] |
| Assumed project capital including site extras | £4,000–£6,000 |
| fully funded host share of sales | 10% |
| part funded host capital share / net share | 50% / 50% |
The workplace cost band is a budgeting reference, not a guesthouse specification. Groundworks, cable runs and connection are extra to that equipment figure. The project total is an assumption allowing for those additions; the second cost reference reinforces the need to price infrastructure separately [S8]. Treat all model amounts as excluding VAT and before grants.
Under fully funded terms the provider supplies, owns and runs the charger, paying operating costs while you provide the parking. part funded assumes an equal capital and surplus split. self funded means you buy the equipment and keep the net operating income.
Reproduce the example as follows: annual energy = daily sessions × 16 × 365. Sales = annual energy × £0.50. Net operating income = annual energy × (£0.50 − £0.25) − £350. Mid use gives 5,840 kWh, £2,920 sales and £1,110 operating income.
| Funding and occupancy | Host income/year | ROI on host capital | Payback in years |
|---|---|---|---|
| fully funded, low / mid / high | £146 / £292 / £438 | No capital contribution | Not applicable |
| part funded, low | £190 | 6.3–9.5% | 10.5–15.8 |
| part funded, mid | £555 | 18.5–27.8% | 3.6–5.4 |
| part funded, high | £920 | 30.7–46.0% | 2.2–3.3 |
| self funded, low | £380 | 6.3–9.5% | 10.5–15.8 |
| self funded, mid | £1,110 | 18.5–27.8% | 3.6–5.4 |
| self funded, high | £1,840 | 30.7–46.0% | 2.2–3.3 |
For part funded, host capital is £2,000–£3,000 and host income is half the operating result. For fully funded, multiply sales by 10%. Simple ROI = host income ÷ host capital × 100. Payback in years = host capital ÷ host annual income. The model excludes financing, tax, business rates, exceptional repairs and displaced parking income.
An empty bay earns nothing while some costs continue. Check seasonal booking records before using the mid or high scenario in your budget. Adjust the income and payback calculator with your actual electricity contract and parking availability.
Which grants and installation rules should you check in Dunstable?
Up to £500 per eligible socket is available through the workplace scheme, with funding ending 31 March 2027 [S6]. Check the installer guidance and voucher process [S13], including whether your proposed guest or staff access meets the scheme conditions.
Public charging has energy-price display and payment duties [S9]. A 100% first-year allowance can apply to qualifying chargepoint expenditure; verify the conditions and timing with your accountant [S10].
Your distribution network operator (DNO) needs to assess supply capacity. Ask your solicitor to check the agreement’s lease term, exit, removal, liability, insurance and redevelopment provisions.
How does the town compare with Central Bedfordshire?
The Central Bedfordshire overview reports 530 public chargers, including 209 rapid, at 1 July 2026 [S5]. This council-wide count includes a larger area than the town boundary and counts devices rather than sites. Use the regional charging overview for the wider comparison.
Next step for a Dunstable host
Record guest stays, usable bays and supply information, then get matched with an installer that covers your area.
Our referral site is operated by Piggy Pineapple Ltd. Installer partners may pay us a fee for enquiries. The owner holds shares in at least one such partner. We name the proposed partner and disclose the owner’s shareholding, if any, before passing your details on. The how-we-work page explains the process.
Common questions
What is the starting cost for a workplace charging unit?
A single 7 kW workplace unit is listed at £1,400–£2,500 in the commercial cost reference; site groundworks, cable runs and connection add to this. [S7]
How would free guest or staff charging change the example?
At the assumed energy rate, giving away a 16 kWh session costs £4 in electricity: 16 × £0.25. Allow for the installation and running costs separately. [S7]
What paperwork starts a workplace grant-funded installation?
The applicant gets a voucher; an authorised installer checks validity and deducts the grant from the eligible invoice. [S13]
Can public charging prices be displayed only as a session fee?
The regulations require a clear maximum energy price per kilowatt hour. A session fee alone does not replace that price information. [S9]
Which public parking serves Priory Gardens?
The town council identifies pay-and-display parking on Church Street and Ashton Square. Check current terms before planning any relationship with your own charging bays. [S11]
Ask about your site
Sources
- Community public charging map, Open Charge Map contributors,Last checked 17 October 2026
- Census 2021 usual residents, TS001, Office for National Statistics via Nomis,Last checked 17 October 2026
- Built-up area boundaries and lookup, Office for National Statistics,Last checked 17 October 2026
- Annual average daily road traffic counts, Department for Transport,Last checked 17 October 2026
- Public EV chargers by local authority, 1 July 2026, Department for Transport,Last checked 17 October 2026
- Changes to chargepoint grants from April 2026, Office for Zero Emission Vehicles,Last checked 17 October 2026
- EV charger installation cost UK 2026, Commercial installation cost reference,Last checked 17 October 2026
- Commercial EV charger installation cost, Commercial charging cost reference,Last checked 17 October 2026
- Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
- First-year allowances for zero-emission cars and chargepoints, HM Revenue and Customs,Last checked 17 October 2026
- Workplace Charging Scheme installer guidance, Office for Zero Emission Vehicles,Last checked 17 October 2026
- Priory Gardens and visitor parking, Dunstable Town Council,Last checked 17 October 2026
- Grove House Gardens and community events, Dunstable Town Council,Last checked 17 October 2026