What could EV charging earn for your Cheshunt business?
A Cheshunt workplace can begin its budget with the published £1,400–£2,500 cost band for a single workplace charger [S7]. Your income depends on paid sessions rather than the town's traffic alone. The office example compares all funding models, including a low-use case with a long ownership payback. Checked October 2026.
What could your Cheshunt office earn from EV charging?
Start with paid demand in your own car park. An office may value staff access even when charging income alone does not justify the capital. Keep that employee benefit separate from the investment return.
This is an illustration, not a quote, for an office providing staff and visiting clients with charging. Kilowatts (kW) describe charging power; kilowatt hours (kWh) describe the energy sold. AC stands for alternating current.
| Office charging input | Value used |
|---|---|
| Equipment | Two 7 kW AC chargers |
| Total site sessions/day, low / mid / high | 0.5 / 1 / 2 |
| Energy in each session | 14 kWh |
| Price paid / electricity purchased | £0.45 / £0.25 per kWh |
| Annual software, maintenance and billing | £350 assumed |
| Installed units before site extras | £2,800–£5,000: two × £1,400–£2,500 [S7] |
| Assumed whole project capital | £5,000–£8,000 |
| fully funded host income | 10% of sales |
| part funded host capital / net income share | 40% / 60% |
Groundworks, cable runs and connection are additional to the charger unit band [S7]. The total budget allows assumed site extras but needs a survey. Infrastructure can dominate the final quote [S8]. Figures exclude VAT and grants; no local offer or utilisation is implied.
fully funded puts installation, ownership, energy and maintenance with the provider, while you supply bays. part funded shares project costs and net operating income on the assumed terms above. self funded leaves you owning the equipment and receiving the operating surplus after costs.
For the site, annual energy = daily sessions × 14 × 365. Sales = energy × £0.45. Self-funded net operating income = energy × (£0.45 − £0.25) − £350. Mid use therefore means 5,110 kWh, £2,299.50 sales and £672 net income.
| Model and use | Annual host income | ROI | Simple payback, years |
|---|---|---|---|
| fully funded, low / mid / high | £115 / £230 / £460 | No capital | Not applicable |
| part funded, low | £97 | 3.0–4.8% | 20.7–33.1 |
| part funded, mid | £403 | 12.6–20.2% | 5.0–7.9 |
| part funded, high | £1,016 | 31.8–50.8% | 2.0–3.1 |
| self funded, low | £161 | 2.0–3.2% | 31.1–49.7 |
| self funded, mid | £672 | 8.4–13.4% | 7.4–11.9 |
| self funded, high | £1,694 | 21.2–33.9% | 3.0–4.7 |
Part-funded capital is £2,000–£3,200; multiply operating surplus by 60% for its income. The fully funded calculation uses sales × 10%, with operating costs paid by the provider. For either ownership route, ROI = host income ÷ host capital × 100; payback = host capital ÷ host income. Rounding follows calculation, not the other way round.
These are simple operating returns before tax, interest, business rates, exceptional repairs or the value of displaced parking. A payback longer than the equipment’s useful life would not recover the investment. Try different use levels in the income calculator and compare the office charging guide.
What charging supply is listed for Cheshunt residents?
The mapped built-up area contains 9 public sites, 20 devices and 2 rapid sites listed on Open Charge Map [S1]. Its Census-based population aggregation is 43,694 [S2], using the ONS settlement boundary [S3]. The calculated rates are 2.1 sites and 4.6 devices per 10,000 residents. For example, 9 ÷ 43,694 × 10,000 rounds to 2.1.
Community listings omit some charging covered by DfT’s council figures. They are a starting point for a competition survey, not an official town total. Check opening hours and working equipment around your proposed site before treating a gap as commercially useful.
How should A10 traffic and Cheshunt visits affect your design?
The busiest matched major-road count is 45,482 vehicles daily on the A10 in the 2025 traffic extract [S4]. Do not apply that flow to a small office entrance. Your recorded staff arrivals and client appointments provide a more direct basis for workplace charging.
Cheshunt’s Old Pond strategy proposes pedestrian improvements and better use of existing centre car parks [S11]. For a shop or pub, check how cable routes and charging bays fit those walking routes before setting out equipment. This is a strategy proposal, not a claim that all its works are complete.
Cedars Park has woodland walks, gardens and a nature centre, with seasonal opening hours [S12]. A nearby host considering leisure visitors should compare its own access hours with those of the park. Proximity alone does not establish permission to use park parking or predict charging sales.
Which grants and rules could affect a Cheshunt installation?
The workplace scheme currently offers up to £500 per eligible socket and has funding until 31 March 2027 [S6]. Use its voucher procedure before eligible work [S13]; customer access requires a specific eligibility check. Public charging also needs compliant price display and applicable payment facilities [S9]. HMRC’s qualifying chargepoint allowance is 100%; check your position with your accountant [S10].
Have the distribution network operator (DNO) assess available power. Ask the council about planning constraints, and your solicitor about landlord consent, insurance, liability, lease duration, redevelopment and exit terms.
How does Cheshunt compare with Broxbourne?
At council level, Broxbourne had 156 public chargers and 50 rapid chargers on 1 July 2026 [S5]. These council-wide devices cannot be compared directly with settlement sites. The East of England page gives regional context.
Next step for a Cheshunt workplace
Bring a staff-demand estimate, parking layout and supply information to your enquiry and get matched with an installer that covers your area.
Piggy Pineapple Ltd runs the site as a referral service and may receive a fee from installer partners. At least one partner has our owner as a shareholder. We will name your proposed installer partner and explain any shareholding our owner holds in it before sharing your information. Read how referrals work.
Common questions
What capital allowance is available for qualifying equipment?
HMRC describes a 100% first-year allowance for qualifying chargepoint expenditure. Have your accountant check your eligibility and expenditure date. [S10]
How can you price employee charging?
Start with energy plus operating costs divided by paid energy. Using the example's mid-use assumptions gives (£1,277.50 + £350) ÷ 5,110 = £0.3185 per kWh before capital recovery. Installation is additional. [S7]
Who redeems a Workplace Charging Scheme voucher?
An authorised installer validates the voucher and claims the grant, deducting it from the customer invoice. [S13]
Does a newly installed public charger need a card reader?
Contactless requirements apply from 8 kW for new public points and at 50 kW or above for existing points. [S9]
Should you count sites or devices when assessing competition?
Record both: the supplied Open Charge Map snapshot has 9 Cheshunt sites but 20 devices. Neither count measures usage or availability. [S1]
Ask about your site
Sources
- Community public charging map, Open Charge Map contributors,Last checked 17 October 2026
- Census 2021 usual residents, TS001, Office for National Statistics via Nomis,Last checked 17 October 2026
- Built-up area boundaries and lookup, Office for National Statistics,Last checked 17 October 2026
- Annual average daily road traffic counts, Department for Transport,Last checked 17 October 2026
- Public EV chargers by local authority, 1 July 2026, Department for Transport,Last checked 17 October 2026
- Changes to chargepoint grants from April 2026, Office for Zero Emission Vehicles,Last checked 17 October 2026
- EV charger installation cost UK 2026, Commercial installation cost reference,Last checked 17 October 2026
- Commercial EV charger installation cost, Commercial charging cost reference,Last checked 17 October 2026
- Public Charge Point Regulations 2023, UK legislation,Last checked 17 October 2026
- First-year allowances for zero-emission cars and chargepoints, HM Revenue and Customs,Last checked 17 October 2026
- Workplace Charging Scheme installer guidance, Office for Zero Emission Vehicles,Last checked 17 October 2026
- Cheshunt Old Pond Strategy, Borough of Broxbourne Council,Last checked 17 October 2026
- Cedars Park facilities and opening hours, Borough of Broxbourne Council,Last checked 17 October 2026