Hitchin has 9 listed charging sites: what is left to add?

Hitchin has 9 public charging sites listed on Open Charge Map in the town snapshot [S1]. Your business should compare those destinations with the wider district before reserving parking. A pub charger could serve longer visits, but income depends on paid sessions, electricity costs and funding terms. The worked example tests low, middle and high use. Checked October 2026.

Last checked 17 October 2026

How does Hitchin compare with North Hertfordshire?

Start with the North Hertfordshire overview, then narrow the assessment to your car park. The district recorded 161 public chargers, including 74 rapid-or-above devices, on 1 July 2026 [S5]. Hitchin’s built-up area contains 35,220 Census residents, approximately 26% of the district population in the town dataset [S2], [S3]. That population share is context, not a target share of chargers.

The East of England overview puts the district in its regional setting. A town-centre pub needs to understand nearby destinations and visitor stays; a council-wide total alone cannot tell you whether your particular customers need charging.

What charging supply is listed inside Hitchin?

The snapshot checked on 17 October records 9 public sites and 20 devices listed on Open Charge Map inside the built-up boundary, including 2 rapid sites [S1], [S3]. This means 2.6 listed sites and 5.7 devices per 10,000 residents: divide each count by 35,220 and multiply by 10,000 [S2].

Open Charge Map is community-maintained and lists fewer points than DfT’s council count. These are listed town sites, not an official total, and a rapid site may contain several devices. Check the local charging tool and visit alternatives before choosing your power and tariff.

The council directory names Lairage on Bedford Road and Woodside on Walsworth Road [S12]. Include both in a parking survey, recording whether their location, access and walking route actually suit your visitors. Availability elsewhere does not necessarily replace charging during a meal at your premises.

Could A602 traffic and market visits bring paying sessions?

The busiest counted major road in the supplied town snapshot is the A602, at 34,044 vehicles a day in 2025 [S4]. That is a road-link flow, not unique drivers or arrivals at your entrance. Check turning access and count your own parking turnover before applying any conversion assumption.

Hitchin Market sits just off the town-centre square and includes general, antiques, craft and farmers markets [S11]. For a pub considering charging, compare market trading periods with ordinary weekdays. A visitor spending time in town may want a different parking arrangement from someone eating at your pub. Do not count an assumed increase in food sales as charger income.

What could a Hitchin pub earn, and when would it pay back?

Consider a pub with private parking and visitors who can stay while charging. The pub guide helps frame the service. Kilowatts (kW) measure power; kilowatt hours (kWh) measure energy. AC means alternating current.

An illustration, not a quote: all operating inputs below are assumptions, not Hitchin usage forecasts.

Input Value or basis
Charger One 7 kW AC unit
Low / mid / high sessions per day 0.5 / 1 / 2
Energy each session 10 kWh
Driver price / energy cost £0.55 / £0.25 per kWh
Software and maintenance £250 a year
Workplace installed-unit benchmark £1,400–£2,500 [S7]
Assumed complete project capital £4,000–£6,000
fully funded host share 10% of gross charging sales
part funded capital / net-income share 50% / 50%

Groundworks, cable runs and connection are extra to the unit benchmark; the assumed project budget allows for site work but needs a survey. Infrastructure scope also affects commercial prices [S8]. No grant is deducted; inputs exclude VAT.

Annual sales = sessions × 10 × 365 × £0.55. Annual operating net = sessions × 10 × 365 × (£0.55 − £0.25) − £250. Under fully funded, the operator buys, owns and runs the charger, pays operating costs and shares sales with you for providing the bay. Under part funded, you contribute £2,000–£3,000 and receive half the operating net. Under self funded, you pay all capital and retain that net.

Model and use Annual host net income Simple ROI Payback, years
fully funded, low / mid / high £100 / £201 / £402 No host capital Not applicable
part funded, low £149 5.0–7.4% 13.4–20.2
self funded, low £298 5.0–7.4% 13.4–20.2
part funded, mid £423 14.1–21.1% 4.7–7.1
self funded, mid £845 14.1–21.1% 4.7–7.1
part funded, high £970 32.3–48.5% 2.1–3.1
self funded, high £1940 32.3–48.5% 2.1–3.1

Simple return on investment (ROI) = annual host net ÷ host capital × 100. Payback = host capital ÷ annual host net. Calculate before rounding. The equal part funded split produces the same percentage and payback as self funded, with smaller cash amounts; an actual offer may divide costs differently. Tax, finance, business rates, exceptional repairs and displaced parking income are excluded.

Use the income and payback tool to test another tariff. Ask the distribution network operator (DNO) about available power. Have your solicitor review planning, land rights, lease duration, insurance, liability, redevelopment, exit and reinstatement before committing bays.

Which grant and tax checks apply to your Hitchin site?

WCS offers up to £500 per eligible socket until 31 March 2027 [S6]. Ordinary business eligibility centres on staff or fleet parking; customer-only provision needs particular care.

Qualifying new chargepoint equipment can receive 100% first-year allowances [S10]. Check with your accountant. Public charging also needs a tariff-display review under regulation 11 [S9]; check with your solicitor.

Next step for a Hitchin host

Prepare your opening hours, parking sketch, supply information and observed dwell times, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service and refers enquiries to installer partners; we may be paid a fee. Our owner holds shares in at least one partner. Before passing on details, we name the recipient and disclose any shareholding our owner holds in it. Read how we work.

Common questions

Can a Hitchin business get installation without paying capital?

A fully funded proposal puts capital with the operator. Compare its scope with the £1,400–£2,500 workplace-unit benchmark [S7]; require connection, ownership and removal terms in writing.

What is an affordable alternative to rapid charging?

A single 7 kW workplace AC unit has a £1,400–£2,500 benchmark before site extras [S7]. Survey the cable route before comparing it with a public customer installation.

Who should handle repairs and driver complaints?

Specify fault response and maintenance in the contract. Regulation 9 requires a staffed helpline for in-scope public operators [S9]; check the operator's classification with your solicitor.

Can charging cars remain after the pub closes?

Regulation 3 permits public chargers with restricted hours [S9]. Set a departure procedure and display access hours before customers start charging; check the arrangement with your solicitor.

How should staff share a customer charging bay?

Define permitted users and a moving procedure first. Regulation 3 distinguishes workplace use from customers purchasing goods or services [S9]; public customer use needs separate assessment.

Does a community map show every competing charger?

No. Open Charge Map is a contributor-maintained listing [S1]. Inspect nearby access, operating status and parking signs rather than interpreting an absent listing as an empty market.

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Open Charge Map public location listings, Open Charge Map contributors,Last checked 17 October 2026
  2. Census 2021 usual residents, TS001, Office for National Statistics via Nomis,Last checked 17 October 2026
  3. Built-up area boundaries and geography, Office for National Statistics,Last checked 17 October 2026
  4. Road traffic counts, Department for Transport,Last checked 17 October 2026
  5. Public charging infrastructure data tables, EVCI0102, Department for Transport,Last checked 17 October 2026
  6. Workplace Charging Scheme, Office for Zero Emission Vehicles,Last checked 17 October 2026
  7. Workplace and commercial installation cost benchmarks, Commercial cost guide,Last checked 17 October 2026
  8. Commercial installation cost and infrastructure scope, Commercial cost guide,Last checked 17 October 2026
  9. The Public Charge Point Regulations 2023, legislation.gov.uk,Last checked 17 October 2026
  10. Claim capital allowances, first-year allowances, HM Revenue & Customs,Last checked 17 October 2026
  11. Markets in North Hertfordshire, North Herts Council,Last checked 17 October 2026
  12. Town car park directory, North Herts Council,Last checked 17 October 2026
Check your site