How do you switch charge point operator or software?

You may be able to keep your chargers when changing operator or software, but first establish ownership, contract exit rights and technical access. OCPP 1.6 does not standardise all connection settings, so manufacturer support or a site visit may be needed [S1]. Require a tested migration plan covering payments, access and records. Checked October 2026.

Last checked 16 October 2026

What does a charge point operator do, and what are you changing?

Start by separating the operator from the management software. The operator runs the charging service. Software supports functions such as session records, access and remote monitoring. The Open Charge Point Protocol (OCPP) connects charging equipment to a charging management system [S1]. See charge point management software before defining your brief.

Write down the actual problem. Is your site losing session records, receiving poor support, struggling with driver payments or paying for functions it does not use? Give prospective suppliers evidence of those problems and ask them to demonstrate the replacement workflow. A fresh dashboard is not a useful outcome if your finance team still cannot reconcile the money.

Can you switch EV charging software without replacing chargers?

Treat compatibility as a condition to prove. The OCA migration guide calls for model and firmware checks before moving equipment. Record those details, the supported protocol and who controls the connection settings. Its discussion of OCPP 1.6 explains why the protocol label alone does not establish remote transferability [S1].

Ask for a demonstration on representative equipment at your site. Your acceptance brief should cover a normal charging session, a failed start, a stopped session and a loss of communications. Ask the technician to explain what staff will see in each case. Agree a recovery plan before changing the remaining equipment.

Keep the hardware replacement option separate in the quotation. That lets you distinguish unavoidable replacement from an operator’s preference for different equipment. Read OCPP and OCPI to separate charger communication from connections between networks.

What contract rights and exit costs should you establish?

Collect your equipment invoice, software subscription, maintenance agreement, site agreement and any funding documents. Ask your solicitor to check ownership, remaining term, notice, termination payments and rights to change the service. Do not assume that owning the land means owning the charger.

Prepare an exit schedule for discussion:

Item Evidence to request
Equipment Ownership and authority to change settings
Software Notice, end date and export access
Maintenance Fault responsibility during cutover
Site rights Lease, licence and equipment removal terms
Money Outstanding payments, refunds and settlement date

For fully funded equipment, request the owner’s written authority before arranging changes. For part funded equipment, establish the parties’ control rights. For self funded equipment, still review the separate software and payment contracts. These are questions for the signed documents, not assumptions about a funding label.

Include removal and reinstatement if the proposed switch requires physical work. Agree who manages temporary bay closures and who tells staff where drivers should park. See end-of-contract checks.

Which charging records and driver data should move?

Prepare a proposed handover pack with asset identifiers, configuration records, meter readings, settlement reports and unresolved support cases. Ask your bookkeeper which exports are needed to close the old account. Keep an accessible copy before cancelling dashboard access.

Driver account information needs a separate decision. Establish which organisation determines the purpose of processing and which processes data on its behalf. The ICO explains that these roles determine contractual responsibilities and that commercial terms do not replace data-protection requirements [S4]. Check with your solicitor before transferring personal data.

For the data schedule, specify the proposed fields, recipient, secure transfer method, retention decision and person authorised to accept delivery. Request confirmation of receipt and a readable sample export. An exported file is only useful if the receiving team can match it to the correct chargers and financial periods.

How do you keep public payments working during migration?

Public operation carries obligations under the Public Charge Point Regulations 2023 [S2]. Assign responsibility for price display, payments, support, open data and roaming in the handover plan. Ask the incoming operator to explain which duties apply to your equipment and access arrangements.

For applicable equipment, contactless payment must remain available. The official guidance also requires public rapid networks to meet a 99% annual average reliability measure; that is a network measure, not a promise about your individual charger [S3]. See the public charging checklist.

Walk the site as a driver. Check the displayed tariff, payment instructions, support number and receipt route. Ask who will handle a disputed session that started under the old operator. Keep a dated list of unresolved refunds so staff are not left directing customers between organisations.

How should you compare migration quotations?

Request separate prices for technical assessment, configuration, visits, replacement communications equipment, payment changes, signs, ongoing software and support. Ask whether the price covers each existing hardware model. No universal migration price or completion time is established here.

Agree measurable acceptance criteria and a named handover lead. Include usable reporting for your finance team, staff access, a witnessed charging session and confirmation that any site power limits still operate. Retain a record of outstanding defects and who will close them. Sign off the completed service against that list.

What should you do next?

Prepare an equipment list and the contracts before seeking proposals. Use service-level agreement questions to define support requirements, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before passing on your details, we name the proposed partner and disclose whether our owner holds shares in it. Read how we work.

Common questions

Can the existing mobile connection stay in place?

Check SIM ownership and transfer permissions. The OCA migration guide identifies SIM reassignment and replacement as separate possibilities; replacement can require an on-site visit [S1].

Will drivers keep their access cards?

Test the existing card identifiers against the new system. The OCA guide includes transferring local authorisation lists; card access should be an explicit acceptance test [S1].

Does changing software remove public charging duties?

No. Public charging status determines scope. The Regulations include price transparency and helpline duties, so allocate these during handover rather than assuming a software change removes them [S2]. Check with your solicitor.

Must a public site offer telephone support after switching?

The official guidance requires a free staffed telephone helpline available at all times. Update the displayed number and test it before accepting the handover [S3].

Can a charging app subscription establish hardware ownership?

It does not settle ownership. Request the purchase, funding and site agreements, and ask your solicitor to identify who can authorise migration. The ICO also separates commercial contract terms from data-processing obligations [S4].

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Migrating charging stations, Open Charge Alliance,Last checked 16 October 2026
  2. Public Charge Point Regulations 2023, UK legislation,Last checked 16 October 2026
  3. Public Charge Point Regulations guidance, Department for Transport,Last checked 16 October 2026
  4. Contracts and liabilities between controllers and processors, Information Commissioner's Office,Last checked 16 October 2026
Check your site