Can battery tariff arbitrage pay back for your business?

Battery arbitrage uses electricity bought at a lower price to displace a higher-priced purchase or support permitted exports later. In the illustration, assumed 90% round-trip efficiency reduces useful output before costs; actual efficiency needs equipment evidence [S1]. Your tariff spread, operating opportunities and funded contract determine whether the remaining value can repay the investment. Checked October 2026.

Last checked 16 October 2026

What does battery tariff arbitrage mean for your business?

Arbitrage means using a price difference across time. Your battery charges when electricity is cheaper, then discharges to reduce purchases when electricity is dearer. Export trading is a separate case with its own permission, metering and purchase terms. The Carbon Trust describes tariff shifting as a business storage use [S1].

A kilowatt (kW) measures power; a kilowatt-hour (kWh) measures energy. Check both the charging power and the energy available for discharge. Ask for a schedule against your actual demand and tariff. A daily price chart alone does not establish that your battery can complete the proposed operation.

Read business electricity prices and battery sizing before comparing equipment offers.

How wide must the tariff spread be after losses and wear?

Use output energy × avoided price − charging energy × charging price − operating costs. Round-trip efficiency describes how much useful energy returns after charging and discharge. Ask for equipment evidence at the intended operating conditions, including auxiliary consumption. The Carbon Trust identifies efficiency and cycling among the parameters to assess [S1].

In the assumptions below, 100 kWh purchased returns 90 kWh. Charging at £0.10/kWh therefore costs £10 / 90 = £0.1111 per useful kWh, before wear or fees. Adding an assumed £0.02/kWh wear reserve gives £0.1311/kWh before fixed costs. The avoided price must exceed that level for a positive contribution.

This is an illustration, not a quote or a tariff offer. Obtain your business contract’s actual time bands and charges. Check whether switching increases the price paid for electricity that cannot be shifted. Test the whole site bill, rather than valuing the battery in isolation from a changed supply contract.

What could the battery earn, and how many years until payback?

All figures are assumptions. This illustration shifts purchases for site use; it includes no export trading, solar income, grant, tax relief or borrowing. Costs exclude recoverable VAT; check your position with your accountant. A wear reserve is included, but it is not a complete replacement forecast.

Assumption Value
Battery usable storage capacity 100 kWh
Charge and discharge power 50 kW
Charging input and useful output per cycle 100 kWh in; 90 kWh out
Assumed round-trip efficiency 90%
Cycles/year, low / mid / high use 100 / 200 / 300
Charge price; avoided purchase price £0.10/kWh; £0.30/kWh
Wear reserve per useful kWh £0.02
Software and maintenance £500/year
Installed capital, self funded £30,000–£45,000
Host capital, part funded £15,000–£22,500
Host capital, fully funded £0
Host net share, fully / part / self funded 20% / 60% / 100%
Charger kW, sessions/day, kWh/session, driver tariff Not applicable; no charger included

The assumed cycles require sufficient charge windows and site demand during expensive periods. They are operating scenarios, not a claim about achievable annual cycling. Ask for interval modelling before replacing these inputs with a site forecast.

Net contribution per cycle = 90 × £0.30 − 100 × £0.10 − 90 × £0.02 = £15.20. Annual net value = cycles × £15.20 − £500. For the mid case, 200 × £15.20 − £500 = £2,540.

For funded cases only, assume the provider recovers the calculated avoided-purchase value through a metered service settlement, pays energy and operating costs, then pays the host its agreed net share. Thus the host receives the share rather than retaining the whole bill benefit as well. This is a hypothetical contract method, not evidence that such an offer is available for your site.

Annual result Low use Mid use High use
Useful output, kWh 9,000 18,000 27,000
Charging purchases £1,000 £2,000 £3,000
Avoided expensive purchases £2,700 £5,400 £8,100
Wear reserve £180 £360 £540
Net value after £500 fixed costs £1,020 £2,540 £4,060
Fully funded host cash income £204 £508 £812
Part funded host net cash income £612 £1,524 £2,436
Self funded annual net benefit £1,020 £2,540 £4,060

Simple return on investment (ROI) = annual host result / host capital × 100. Payback = host capital / annual host result. The ranges reflect the assumed capital costs, not a statistical forecast.

Funding result Low use Mid use High use
Part funded ROI 2.7–4.1% 6.8–10.2% 10.8–16.2%
Part funded payback, years 24.5–36.8 9.8–14.8 6.2–9.2
Self funded ROI 2.3–3.4% 5.6–8.5% 9.0–13.5%
Self funded payback, years 29.4–44.1 11.8–17.7 7.4–11.1

These are undiscounted arithmetic results. Long paybacks may exceed the supported operating life of the offered equipment; do not assume the calculated cash flow persists until recovery. Self funded has avoided-cost benefit, not electricity sales income. Fully funded has no host capital payback in this example.

Which funding terms and site limits could change the result?

For fully funded, confirm the provider pays capital and operation and state exactly how your income is measured. For part funded, check ownership, shared costs and buy-out rights. For self funded, budget for equipment operation and retain the net benefit. Ask your solicitor to review term length, exit, access, damage and removal provisions.

Your distribution network operator (DNO) manages the local network. G99 is the engineering recommendation for relevant generation connections. UK Power Networks includes storage in its small generation application process [S3]. Ask your own DNO to confirm the combined equipment and import/export limits before procurement.

If export is proposed, check the electricity purchaser’s terms. Ofgem’s Smart Export Guarantee storage guidance distinguishes eligible renewable generation from other exported electricity [S2]. Keep grid trading separate from solar self-consumption and export.

The government’s flexibility roadmap recognises battery fire risk and the need to manage it [S4]. Request a site safety assessment, insurer requirements and an installation plan covering access and emergency arrangements. Read battery fire safety before choosing a location.

What should you do next?

Request a whole-site bill comparison, a supported cycling forecast and itemised funding terms.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing details, we name the proposed partner and disclose any shareholding the owner holds in it. Read how we work and get matched with an installer that covers your area.

Common questions

Do you need solar panels to shift electricity purchases with a battery?

No. The Carbon Trust describes battery-only systems charging from the grid at lower prices and using that energy when prices rise. Confirm that your business tariff and installation support the intended schedule [S1].

Does adding solar make all battery exports eligible for SEG payments?

No. Ofgem distinguishes eligible generation from other electricity exported through the meter. A supplier is not obliged to pay for mixed export where eligible generation cannot be distinguished [S2].

Can a battery connect without declaring the solar already on site?

Give the network the combined installation details. UK Power Networks' small generation process assesses the devices and supporting evidence to identify the applicable application and declarations [S3].

Does more stored energy automatically mean more profitable export?

No. Test permitted export power and time available as well as energy capacity. Storage needs the applicable network connection process; ask the designer to model the actual accepted constraints [S3].

Can you use the same battery capacity for backup and trading simultaneously?

Ring-fence any reserve before modelling trading output. The Carbon Trust discusses backup and tariff management as different uses. Ask the designer to state usable trading energy after the reserve is applied [S1].

Ask about your site

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Energy storage technology guide for SMEs, Carbon Trust,Last checked 16 October 2026
  2. Storage co-location and treatment of exported electricity, Ofgem,Last checked 16 October 2026
  3. Small generation and storage network applications, UK Power Networks,Last checked 16 October 2026
  4. Clean flexibility roadmap July update, Department for Energy Security and Net Zero,Last checked 16 October 2026
Check your site