What are DUoS red, amber and green time bands?

DUoS red, amber and green are time bands used in distribution network unit charges. They distinguish periods with different rates, rather than your entire electricity price. National Grid Electricity Distribution lists the bands in Annex 1 of its regional statements [S1]. Check your network area, tariff and supply contract before rescheduling charging. Checked October 2026.

Last checked 19 October 2026

What do DUoS colour bands mean for your site?

DUoS red, amber and green are time bands used to apply different Distribution Use of System unit charges. DUoS funds use of the local electricity distribution network. Its colour-banded energy rates sit alongside other charging components [S1].

Why it matters for your site: flexible vehicle charging could move electricity use between differently priced network periods. First establish whether your supply contract passes through those differences.

Red generally represents the higher-priced period, amber the intermediate period and green the lower-priced period in the published import tables [S1], [S2]. These are network charges, not a complete retail electricity price or a signal about electricity’s carbon intensity.

Where do you find your site’s timetable?

Your distribution network operator (DNO) runs the local network. Use its charging statement for the relevant year and your tariff identifier. The East Midlands and West Midlands statements each put the low- and high-voltage designated-property tables in Annex 1 [S1], [S2]. UK Power Networks publishes separate statements for its network areas [S3]. Do not copy another site’s schedule without checking these details.

The half-hourly metering and DUoS guide covers the wider bill. Use business electricity prices as market context, rather than your site’s network rate card.

Could charging during green periods change your bill?

Ask your supplier to explain the relevant contract clauses and identify which charges vary with timing. Then test a schedule against vehicle departures and site capacity.

For an illustration, assume you move 100 kilowatt-hours (kWh), a unit of energy, from a period costing 5p more per kWh under your contract. Variable-cost difference = 100 × £0.05 = £5. Both inputs are assumptions, not published rates. Fixed charges remain separate [S1]. Include any extra operating costs before budgeting a benefit.

Next step

Use the cut-energy-costs hub and site check to prepare your schedule, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing your details, we name the proposed partner and disclose any shareholding in it.

Common questions

Is green-band electricity free?

No. Green identifies a distribution unit-charge period. The East Midlands table lists a green unit rate alongside separate fixed and capacity components; it is not a zero-price electricity offer [S1].

Does every site use the same national timetable?

No national table should be assumed. UK Power Networks publishes separate charging statements for Eastern, London and South Eastern network areas; select the area and effective year for your supply [S3].

Where can you check the applicable colour bands?

Start with the relevant network charging statement and tariff identifier. The West Midlands statement places low- and high-voltage designated-property time bands in Annex 1 [S2].

Does shifting charging remove standing charges?

Do not count fixed charges as a time-shifting benefit. The East Midlands statement lists fixed daily and capacity charges separately from colour-banded energy rates [S1].

Which clock should a charging schedule follow?

Check the statement's time convention and your controller's settings. The West Midlands Annex 1 explicitly uses UK clock time; do not assume its times are fixed UTC throughout the year [S2].

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. East Midlands use of system charging statement effective April 2026, National Grid Electricity Distribution,Last checked 19 October 2026
  2. West Midlands use of system charging statement effective April 2026, National Grid Electricity Distribution,Last checked 19 October 2026