What is a REGO certificate for renewable electricity?

A REGO is an Ofgem-administered certificate recording eligible renewable electricity generation. Ofgem issues one certificate per megawatt-hour, or MWh, of eligible output [S1]. It supports disclosure of electricity sources. For your business's market-based Scope 2 reporting, the associated evidence must meet the applicable accounting quality criteria; a green label alone does not establish that [S2]. Checked October 2026.

Last checked 19 October 2026

What does a REGO certificate mean for your site?

A REGO is a certificate administered by Ofgem that records eligible renewable electricity generation [S1]. Why it matters for your site: it helps document a renewable electricity claim, but the claim still needs a clear accounting basis.

Ofgem issues one REGO for each megawatt-hour (MWh) of eligible renewable output. The scheme’s main use is Fuel Mix Disclosure, through which licensed suppliers disclose the fuels used to generate their electricity [S1].

Does a green tariff identify the electricity reaching your building?

A certificate records generation attributes. It does not trace particular electricity through the shared grid to your premises. GHG Protocol distinguishes attribute tracking from physical energy delivery [S2]. Ask which certificates support your purchased electricity and which consumption period they cover.

For example, assume your site purchases 20 MWh in a reporting period. Matching that quantity would require evidence covering 20 MWh: 20 × one certificate per MWh = 20 REGOs [S1]. This is quantity arithmetic, not confirmation that the evidence meets your reporting requirements or that a project has created extra renewable generation.

How do REGOs relate to market-based Scope 2 reporting?

Scope 2 covers emissions associated with purchased energy. The market-based method uses qualifying contractual information; the location-based method reflects generation where consumption occurs. GHG Protocol sets quality criteria for instruments and addresses double counting, cancellation and generation-period matching [S2].

Request the evidence behind the claim and the emission factor used. Its reporting FAQ also requires disclosure of the instrument categories and confirmation that quality criteria are met [S3]. Ask your reporting adviser to review the record before publishing a carbon statement.

Use carbon reporting and Scope 2 and the emissions scopes glossary for the wider accounting framework. Keep energy-cost analysis separate, using business electricity data.

Next step

For a site energy project, use the cut energy costs hub, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before sharing your details, we name the proposed partner and disclose any shareholding our owner holds in it.

Common questions

Who issues REGO certificates?

Ofgem administers the scheme for eligible generation in Great Britain and Northern Ireland. Its scheme overview identifies the respective government and regulatory bodies on whose behalf it acts [S1].

How much electricity does a REGO represent?

One certificate represents one MWh of eligible renewable output. Match the certificate quantity and generation period to the claim your business intends to make [S1], [S2].

Can your rooftop solar installation receive REGOs?

Eligible renewable generating stations in Great Britain and Northern Ireland can apply through Ofgem's renewable electricity register. Confirm accreditation and who retains the certificates in your project contract [S1].

Does buying certificates replace location-based reporting?

No. GHG Protocol requires both location-based and market-based Scope 2 totals where its dual-reporting requirements apply. Check the reporting boundary and evidence with your reporting adviser [S2].

What should you retain for a renewable electricity claim?

Keep the contract, certificate allocation or cancellation evidence, consumption period and emission-factor basis. GHG Protocol requires disclosure of the instruments used and conformity with its quality criteria [S2], [S3].

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. REGO scheme overview, Ofgem,Last checked 19 October 2026
  2. Scope 2 Guidance, GHG Protocol,Last checked 19 October 2026
  3. Top Ten Questions about the Scope 2 Guidance, GHG Protocol,Last checked 19 October 2026
Check your site