Solar and charging affect your carbon report through electricity use and the reporting boundary you choose. Scope 2 covers purchased energy, according to GHG Protocol [S1]. Installing chargers alone does not prove an emissions reduction. Separate your site's electricity, driver consumption and renewable claims before comparing the income case. Checked October 2026.

Last checked 17 October 2026

What counts as Scope 2 emissions at a charging site?

Scope 2 covers emissions from producing purchased electricity, heat, steam and cooling. It describes an accounting category, rather than the equipment standing in your car park. GHG Protocol sets the energy accounting framework. [S1] Start with the emissions glossary.

For your project, draw a diagram showing the incoming supply, building, solar array, battery and chargers. Mark who buys electricity at each boundary. Ask your reporting adviser to confirm the treatment of electricity sold to visitors or purchased by another operator. A land lease does not, by itself, settle that classification.

Use the diagram to request the right exports from the installer. A monthly payment statement cannot replace energy records. Kilowatts (kW) measure power; kilowatt-hours (kWh) measure energy used over time. Keep both in your asset register, but use energy consumption in the emissions calculation. Government conversion factors support activity-based calculations using purchased electricity. [S3]

How should you report carbon reductions from solar and charging?

Keep the electricity calculation separate from the business case. UK reporting guidance describes location-based electricity accounting and a separate market-based approach for contractual purchases. [S2] Do not treat a charger installation photograph as evidence that either result has fallen.

Build a reconciliation rather than a headline percentage:

Record What you should request Check before making a claim
Grid import Supplier meter readings and invoices Same site and reporting period
Solar generation Generation meter export Separate generation from self-consumption
Exported energy Export meter record Keep it apart from energy used on site
Charging delivered Session and charger meter exports Explain the boundary and losses
Renewable attributes Contract and certificate evidence Confirm who retains the claim

This is a suggested evidence pack, not a prescribed reporting form. Agree the format with whoever signs off your report. Include the unit, period and file owner so that the next reporting cycle can reproduce the result.

For a transparent calculation, use: purchased kWh × the applicable kg CO2e per kWh ÷ 1,000 = tonnes CO2e. CO2e means carbon dioxide equivalent. Select the factor from the relevant government workbook and record its category. [S3] This page does not quote a factor because selecting the category comes before using a number.

Why do renewable electricity claims need separate evidence?

Ask what your contract actually transfers. Ofgem describes renewable electricity certificates as evidence supporting fuel-mix disclosure, with additional uses in carbon accounting. [S4] A marketing description alone is insufficient evidence for the claim you want to put in a customer tender.

GHG Protocol applies quality criteria to contractual instruments used for market-based reporting. [S1] Ask your adviser to review the evidence before you publish the result. For owned solar, include any sale or transfer of renewable attributes in that review. Read about electricity supply contracts before linking a tariff change to your carbon reduction plan.

Keep avoided vehicle emissions outside the project income table. A comparison with petrol or diesel needs its own mileage, vehicle and energy assumptions. Do not count an unpriced carbon benefit as money available to repay installation costs.

Could the charging project earn income and repay its capital?

The following is an illustration, not a quote. All commercial inputs are assumptions, not market benchmarks. It isolates charging income; solar output, carbon value and additional shop sales are excluded.

Assumed input Value
Charging equipment Two 7 kW sockets
Low / mid / high use 1 / 2 / 4 sessions daily across the site
Delivered energy 20 kWh per session; 365 operating days
Driver price / effective energy cost £0.50 / £0.25 per delivered kWh
Software and maintenance £600 yearly, allocated to the investor
Gross revenue share to host fully funded 10%; part funded 60%; self funded 100%
Host capital fully funded £0; part funded £4,000–£6,000; self funded £8,000–£12,000

Assume the funder bears every operating cost under fully funded. For part funded the host receives its gross share, then pays the same share of energy and overheads. Under self funded it pays them all. Effective energy cost includes losses; no separate loss adjustment is added. Amounts exclude VAT, tax, borrowing, rates, land opportunity cost and major replacement, which a site appraisal must add.

Annual energy = sessions × 20 × 365. Self funded annual net = energy × (£0.50 − £0.25) − £600. Part funded net = 60% × that net. Fully funded income = 10% × energy × £0.50.

Host result Low use Mid use High use
fully funded yearly income £365 £730 £1,460
part funded yearly net £735 £1,830 £4,020
part funded simple ROI 12.3–18.4% 30.5–45.8% 67.0–100.5%
part funded payback, years 5.4–8.2 2.2–3.3 1.0–1.5
self funded yearly net £1,225 £3,050 £6,700
self funded simple ROI 10.2–15.3% 25.4–38.1% 55.8–83.8%
self funded payback, years 6.5–9.8 2.6–3.9 1.2–1.8

Simple ROI = annual net ÷ host capital × 100. Payback = host capital ÷ annual net; it ignores timing and later replacement. Check with your accountant before using these figures for an investment decision.

What should you confirm before approving the project?

Request a survey covering spare power, cable routes, accessible parking, planning and retained customer bays. Ask who contacts the distribution network operator (DNO), the company responsible for the local electricity network, when connection changes are needed. Do not assume a carbon-reporting objective makes a location suitable.

Put data access into the specification: downloadable readings, reporting boundaries, correction procedures and access after a contract ends. Review land tenure, removal costs, liability and business rates with the relevant adviser. Compare the three-model business case using the same charging demand before signing away parking space.

What should you do next?

Gather your bills, reporting boundary and proposed charging demand. Read how we work, then get matched with an installer that covers your area. Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before passing on your details, we name the proposed partner and disclose any shareholding our owner holds in it.

Common questions

Where should your business start with Scope 1, 2 and 3 reporting?

Draw your organisational boundary and list fuel, purchased energy and value-chain activities separately. GHG Protocol's energy guidance addresses Scope 2; use the government reporting framework to classify the remaining activities before calculating totals. [S1] [S2]

Does charging a company vehicle move all its emissions into Scope 2?

Purchased electricity used within your reporting boundary belongs in your energy calculation. Vehicle manufacture and other value-chain emissions remain separate categories; electrification does not erase them. Record energy consumption and explain which activities the comparison includes. [S2]

Can your carbon reduction plan use a different factor each year?

Government conversion factors are published annually. Record the factor year and method beside each result, and distinguish changes in electricity consumption from changes in the factor. [S3]

Can a green supply contract replace your grid-average figure?

Government guidance recommends showing a qualifying market-based figure alongside the location-based result. Keep the supplier evidence and explain the contractual method instead of deleting the grid-average calculation. [S2]

Can your report use estimated data when a meter reading is missing?

Document the estimation method and which period it covers. Government reporting guidance addresses data collection and estimates; retain the supporting bills and replace provisional data when reliable readings become available. [S2]

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Scope 2 Guidance, GHG Protocol,Last checked 17 October 2026
  2. Environmental Reporting Guidelines, UK Government,Last checked 17 October 2026
  3. Greenhouse gas reporting conversion factors 2026, DESNZ,Last checked 17 October 2026
  4. REGO guidance for generators, agents and suppliers, Ofgem,Last checked 17 October 2026
Check your site