Do you need single-phase or three-phase power for EV charging?

Your charging requirement decides whether a supply upgrade is useful. Energy Saving Trust says 22 kW AC charging needs a three-phase supply, but your vehicle can limit the speed [S2]. Check spare capacity and parking time before committing to an upgrade. Load management may let you serve more vehicles on your existing connection. Checked October 2026.

Last checked 16 October 2026

What is the difference between single-phase and three-phase supply?

Your supply is the connection bringing electricity into your site. UK Power Networks describes single-phase as the smaller supply and recommends an electrician’s assessment of the equipment you intend to run [S1].

For a charging project, start with the vehicles and their departure times. A larger connection is useful only when the charging plan needs it. A hotel with cars parked overnight and a delivery business with vehicles returning between shifts should not order the same arrangement without checking their needs.

Kilowatts, written kW, measure power: how fast energy is transferred. Kilowatt-hours, written kWh, measure energy: how much you buy or deliver. Use our power and energy guide when reading equipment schedules. A distribution network operator, or DNO, manages the local electricity network. It is different from the supplier that bills you for electricity.

How do you check whether your business has three-phase power?

Ask your electrician to record the incoming supply arrangement, protective devices, distribution boards and existing loads. UK Power Networks says the service head’s fuse arrangement can provide a visible indication: single-phase commonly has a single fuse, while three-phase has a set of three [S1]. Do not remove covers or seals to investigate it yourself.

Collect a recent bill, any connection agreement and a site plan before the visit. Ask the survey report to distinguish the equipment rating from the spare capacity actually available while your business is operating. That distinction makes it easier to compare offers on the same basis.

Keep a list of equipment likely to run alongside charging: refrigeration, ovens, workshop machinery or heating. Record seasonal events and planned additions. A quiet-day visit should not become the sole design assumption for a busy trading day. See how much power your site has.

Do you need three-phase power for a 22 kW charger?

Energy Saving Trust says 22 kW alternating current, or AC, charging requires a three-phase supply. It also explains that the vehicle’s onboard charger can restrict the power accepted [S2]. Buying a higher-rated post does not remove that vehicle limit.

Use the following as a purchasing checklist, rather than an equipment recommendation:

Your question Evidence to request
Can the building support the proposed equipment? Supply assessment and load schedule
Can the vehicles use its output? Each vehicle’s AC charging specification
Will charging finish in time? Arrival energy, required departure energy and parking window
Will other equipment restrict charging? Measured demand and the proposed control settings

Compare AC and DC chargers before assuming a supply upgrade is the answer to a short parking window. Direct current, or DC, charging is a different equipment decision.

How fast do your vehicles actually need to charge?

Use energy required divided by usable charging time as a first calculation. This is a planning calculation; your designer must allow for losses and operating restrictions before using it as a specification.

For illustration, assume a van needs 28 kWh and stays for 8 hours. Average delivery would need to be 28 ÷ 8 = 3.5 kW before losses. Change the stay to 2 hours and the same energy requires 14 kW. These are assumptions, not typical van consumption or a forecast of charging performance.

Repeat this calculation for the busiest credible day. Include early departures and vehicles that return late. Ask whether charging should follow a queue, share capacity equally or prioritise vehicles due to leave. The point is to specify completed journeys, rather than purchase the largest charger on a product sheet.

Could load management avoid a supply upgrade?

Energy Saving Trust describes load management as distributing available power without exceeding the site’s spare capacity [S2]. Ask for a comparison between a controlled charging layout and a connection upgrade.

Make the comparison practical. Request the delivered energy at each departure time, the behaviour when communications fail, and who can change the power limit. Ask your electrician to consider individual phase loading as well as the overall site figure. Put those requirements in the survey brief rather than attempting to set electrical limits yourself.

Our load management versus grid upgrade guide helps organise that comparison. Include a fallback operating plan for a vehicle that misses its intended charging window, such as reallocating a departure or using another charging location.

What should a three-phase upgrade quote include?

Request separate lines for network work, metering, your distribution equipment, cable routes, reinstatement and charger installation. UK Power Networks distinguishes upgrading the supply from changing the meter [S3]. Ask each party to identify its scope so that an apparent all-in price does not leave work unallocated.

Do not apply a residential upgrade price to your business without a survey. A car park cable route, trading access and excavation arrangements belong in the specification. Request a programme showing dependencies and the proposed electricity interruption, then compare the disruption with your opening hours.

For fully funded proposals, ask who pays for that work and whether it changes the lease or income share. For part funded and self funded proposals, identify the host’s contribution separately. Ask your solicitor to check access rights, redevelopment options and removal obligations before signing any land agreement.

What should you do next?

Prepare your vehicle list, parking windows and existing electricity information. Then get matched with an installer that covers your area for a supply and charging assessment.

Piggy Pineapple Ltd operates this advice and referral service. We refer enquiries to installer partners and may be paid a referral fee. Before passing on your details, we will name the proposed partner and disclose any shareholding the owner holds in it. Read how we work.

Common questions

Can a three-phase charger make every vehicle charge faster?

No. The vehicle's onboard AC charger limits the rate it accepts. Check the actual vehicle specification alongside the chargepoint rating before choosing equipment [S2].

Should you open the service head to check your supply?

Use an electrician's assessment. UK Power Networks describes visible fuse arrangements as an indicator; its advice is to have a qualified electrician assess the equipment and power requirement [S1].

Does a smart meter upgrade add more electrical capacity?

Treat metering and supply capacity as separate jobs. UK Power Networks distinguishes supply upgrades from meter changes, which you arrange through the company supplying your electricity [S3].

Can several vehicles share a limited supply?

Load management can divide available power between connected vehicles. Calculate the energy needed before departure to check whether that reduced charging rate is sufficient [S2].

Is there a standard upgrade capacity for every business?

No. UK Power Networks describes its small-property three-phase upgrade route as providing up to 70 kVA, a measure of apparent power. This is network-specific guidance, not your site's offer [S3].

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. What's the difference between a single phase and three phase electricity supply?, UK Power Networks,Last checked 16 October 2026
  2. Charging your business's electric vehicles, Energy Saving Trust,Last checked 16 October 2026
  3. What do you need to upgrade?, UK Power Networks,Last checked 16 October 2026
Check your site