Which EV connector types does your business need: CCS or Type 2?

Type 2 is used for AC charging; the European CCS connector adds 2 larger contacts for DC charging, as Network Rail explains [S1]. Choose around your visitors' vehicles and parking time, then check cable reach, available power and payment. A connector's shape alone does not tell you the charging speed your customer will receive. Checked October 2026.

Last checked 16 October 2026

What is the difference between Type 2 and CCS?

Type 2 is an alternating current (AC) charging interface. CCS means Combined Charging System. The European version, also called Combo 2, adds direct current (DC) contacts below the Type 2 section. Network Rail explains these different interfaces in its charging infrastructure guide. [S1]

For procurement, put the connector type and power rating on separate lines. Power is measured in kilowatts (kW); energy delivered is measured in kilowatt-hours (kWh). A connector is the physical interface, while a charging session also depends on the equipment and vehicle behind it. [S1]

Item to specify Type 2 AC CCS DC
Vehicle interface Type 2 AC inlet CCS Combo 2 inlet
AC-to-DC conversion Vehicle equipment Charging equipment
Vehicle power limit Check AC specification Check DC specification
Site decision Match the parking window Check need and supply

The technical distinctions above follow Network Rail’s guide. The procurement questions are a way to apply them to your site, rather than a claim that either interface suits every business. [S1]

Which cable should you specify for your visitors?

Prepare a list of vehicle types before choosing the cable arrangement. For a known fleet, ask for its inlet specifications and charging limits. For mixed customer parking, request a compatibility schedule explaining which vehicles the proposed equipment serves and which require another arrangement.

Also ask what drivers must bring. State clearly whether your AC equipment has a socket for a driver’s cable or a cable attached to the unit. DC units use attached charging cables in the arrangements described by Network Rail. Make the operational distinction visible in your parking information. [S1]

Do not write that your equipment serves every electric vehicle. Older vehicles and imported vehicles may have different charging interfaces. Obtain evidence for the actual population you intend to serve, including pool cars, delivery vans or regular visitors. [S1]

Use AC versus DC chargers to compare the charging method with the parking window. For a hotel, request a design for overnight top-ups. For a short-stop business, request a separate assessment of energy delivered before the driver leaves.

How should connector compatibility affect the parking layout?

Request a drawing showing how each proposed cable reaches vehicles in their permitted parking positions. Include front-mounted and rear-mounted inlets in the demonstration. Ask how a driver with restricted mobility will reach the interface and return the cable without crossing moving traffic.

Treat cable handling as part of acceptance testing. Have someone unfamiliar with the proposed equipment try the physical sequence: park, find the connector, reach the inlet, start charging and return the cable. Record any issue for the designer to resolve before handover.

Network Rail’s guide considers the equipment and wider charging environment together. Use it to structure the discussion; it does not replace a site-specific accessibility assessment. Read accessible charging for the related design questions. [S1]

Leave delivery access, pedestrian routes and neighbouring bays visible on the same drawing. A cable that only reaches when a car occupies the next bay creates an operating problem that a connector label cannot solve.

Does the right connector mean you have enough power?

No. Ask a distribution network operator (DNO), which manages your local electricity network, about the connection where your proposed load requires it. Government guidance recommends early discussion for multiple workplace or depot chargers. [S3]

Ask the electrical designer for the maximum site draw and what each bay receives during simultaneous charging. A successful compatibility check does not establish either of those figures. Review your existing supply and normal building demand alongside the equipment schedule.

Consider a hypothetical customer needing 15 kWh during a stay. At an assumed average of 7.5 kW, the arithmetic is 15 ÷ 7.5 = 2 hours, before losses or interruptions. This is an illustration, not a vehicle charging claim. Repeat the calculation using evidence for your intended vehicles and sessions.

See dwell time and charger speed and site power before finalising the order.

What else belongs on your equipment checklist?

Connector selection does not settle payment, support or software arrangements. Public charging guidance sets out requirements according to the installation’s scope and rating. Confirm these with the operator before opening paid access, including how customers see the tariff and obtain help. [S2]

Ask whether the proposed equipment supports Open Charge Point Protocol (OCPP), a communications protocol between charging equipment and management systems. Network Rail describes its role in interoperability. Request the supported version and functions in writing rather than treating a logo as an operating agreement. See charging protocols. [S1]

Use a commissioning checklist that includes a compatible vehicle charging, the intended payment route, session records and the support number. Agree who owns a fault if the cable, vehicle handshake or management system fails. Keep that allocation in the service specification.

What should you do next?

Bring your fleet list or visitor vehicle evidence, parking drawing and available supply information. Compare commercial charger costs, then get matched with an installer that covers your area.

Piggy Pineapple Ltd operates this referral service. We refer enquiries to installer partners and may be paid a fee. Our owner holds shares in at least one partner. Before passing on details, we name the proposed partner and disclose whether our owner holds shares in it. Read how we work.

Common questions

Does a Type 2 plug fit a European CCS vehicle inlet?

A compatible vehicle can accept Type 2 AC through the upper part of its Combo 2 inlet. Confirm the vehicle specification, because AC and DC charging capabilities are separate. [S1]

Does a Type 2-only car accept a CCS charging cable?

Do not assume it does. The CCS plug includes additional DC contacts and requires a compatible vehicle inlet and DC charging system. Check the vehicle's connector specification before directing it to a bay. [S1]

Is Combo 2 another name for the European CCS connector?

Yes. The European arrangement combines the Type 2 interface with additional DC contacts. Specify the regional connector and charging mode explicitly when ordering equipment. [S1]

Can you choose charging speed from the plug shape?

No. The charger, vehicle and available electrical supply also matter. Ask for both the AC and DC power specifications relevant to the vehicles using your site. [S1] [S3]

Is a payment app enough for a new paid public charger?

Not in every case. Contactless requirements apply to new public units rated 8 kW and above deployed after 24 November 2024 and all public units rated 50 kW and above, subject to the guidance's exceptions. [S2]

Ask about your site

More about your project (optional)

Free for site owners. No obligation. We name the installer partner before we pass on any details.

Read our privacy notice

Sources

  1. Electric vehicle charging points and associated infrastructure, Network Rail,Last checked 16 October 2026
  2. Public Charge Point Regulations 2023 guidance, Department for Transport,Last checked 16 October 2026
  3. Connecting electric vehicle chargepoints to the electricity network, UK Government,Last checked 16 October 2026
Check your site